Procurement Summary
State : Madhya Pradesh
Summary : Electrical Work for Shifting of Pump Controller from under Gear to Upper Gear with 01 No. Additional Mpcb and Shifting of Rcbo of Mobile Charging Points from under Gear to Upper Frame in Lhb Non Ac Co...
Deadline : 08 Apr 2024
Other Information
Notice Type : Tender
TOT Ref.No.: 98909486
Document Ref. No. : ELECT-GEN-BPL-T-12-2024
Competition : NCB
Financier : Self Financed
Purchaser Ownership : Public
Document Fees : Refer Document
Tender Value : ₹ 606069.60
EMD : ₹ 12100.00
Purchaser's Detail
Purchaser : WEST CENTRAL RAILWAY
Address: BHOPAL DIVISION-ELECTRICAL/WEST CENTRAL RLY
City: Bhopal
District: Bhopal
State: Madhya Pradesh
Pin: 462036
Tel/Fax: 91-755-2457214
Country: India
Email: cmmswcr@gmail.com
Website: http://wcr.indianrailways.gov.in
Tender Details
Electrical work for shifting of pump controller from under gear to upper gear with 01 no. additional MPCB and shifting of RCBO of mobile charging points from under gear to upper frame in LHB Non AC coaches.
Supply of Motor protection circuit breaker (MPCB) current rating: 1.6A, thermal release range: 1- 1.6 A, Class: 10, breaking capacity: 50 Ka, Pole : 3, Voltage: 415 V AC, Confirming to IS/IEC : 8828 : 1996 or 60898 IS/IEC -1:2002 (superseding IS 8828:1996, as per bill of material of RDSO Specification No. RDSO /PE/Spec/AC/0184-2015 (rev 0) or latest. 2 2 5250.00 Metre 29.34 154035.00 AT Par 154035.00
Contract Type : Works
Tender Type : Open
Advertised Value : 606069.60
Bidding Style : Single Rate for Tender
Bidding System : Single Packet System
Pre-Bid Required : No
Pre-Bid Query Date Time : Not Applicable
Tendering Section : GEN
Bidding Unit : Above/Below/Par
Publishing Date / Time : 16/03/2024 12:50
Period Of Completion : 3 Months
Bidding Start Date : 25/03/2024
Closing Date Time : 08/04/2024 15:00
Validity of Offer ( Days) : 60
Are Joint Venture (JV) firms allowed to bid : -
Tender Doc. Cost (Rs.) : 0.00
Earnest Money (Rs.) : 12100.00
Documents
Tender Notice
viewNitPdf_4510041.pdf
GCC_April-2022_2022.pdf
CorrectionslipGCC14.07.2022.pdf
CorrectionslipGCC13.12.2022.pdf
CorrectionslipGCC26.04.23.pdf
CorrectionslipGCC07.08.23.pdf
CorrectionslipGCC20.10.23.pdf
CorrectionslipGCC21.12.23.pdf
technicalspecsandspecialconditions.pdf