Procurement Summary
State: Bihar
Summary: Turnkey Contract for the Work of Supply, Installation, Commissioning of Plant, Equipments & Related Infrastructure and Operation of Mechanized Laundry at Kir. Collection of Soiled Linen from Coaches F...
Deadline: 22 May 2025
Other Information
Notice Type: Tender
TOT Ref.No.: 118499702
Document Ref. No.: 03-BOOT-KIR-25
Financier: Self Financed
Purchaser Ownership: Public
Document Fees: Refer Document
Tender Value: ₹ 945572413.50
EMD: ₹ 4877900.00
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Turnkey Contract for the work of Supply, Installation, Commissioning of Plant, Equipments & related infrastructure and operation of Mechanized Laundry at KIR. Collection of Soiled Linen from coaches from KIR, KNE, NJP & BLGT Railway Station and loading of washed linen into coaches at KIR, KNE, NJP & BLGT Railway Station for a period of 10 years under BOOT (Build own operate Transfer) Basis.
Collection of Soiled Linens (Consisting of Bed Sheets, pillows, pillow covers, towels), blankets, blanket covers, curtains etc. from nominated coaches and from nominated location, transportation them to the laundry, washing, drying, ironing and delivery of the packed linen items in sets and other items at nominated locations as per scope of work and all other terms and condition indicated in the tender document under Build Own Operate Transfer scheme for establishment of Mechanized Laundry (Qty in Per Kg of linen under dry weight)
Contract Type : Service - General
Tender Type : Open
Advertised Value : 945572413.50
Bidding Style : Single Rate for Tender
Bidding System : Two Packet System
Pre-Bid Required : Yes
Pre-Bid Query Date Time :
Tendering Section : TENDER
Bidding Unit : Above/Below/Par
Publishing Date / Time : 28/04/2025 20:06
Period Of Completion : 128 Months
Bidding Start Date : 08/05/2025
Closing Date Time : 22/05/2025 15:00
Validity of Offer ( Days) : 180
Are Joint Venture (JV) firms allowed to bid : Yes
Tender Doc. Cost (Rs.) : 0.00
Earnest Money (Rs.) : 4877900.00
Documents
Tender Notice
viewNitPdf_4940573.pdf
03-BOOT-KIR-25.pdf