Procurement Summary
State : -
Summary : Set Of Gaskets For Mph [Converter And Transformer Oil Pump], Each Set Consists Of 2 Items. 1. Gaskets For Shil Make Converter Oil Pump [Sr].Consists Of 5 Items. [I]Terminalbox Nitril Rubber Gasket Pt....
Deadline : 30 Dec 2016
Other Information
Notice Type : Tender
TOT Ref.No.: 9653050
Document Ref. No. : 02165427-B
Financier : Self Financed
Purchaser Ownership : -
Document Fees : Refer Document
Tender Value : Refer Document
EMD : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
Set of Gaskets for MPH [converter and Transformer oil pump], Each set consists of 2 items. 1. Gaskets for SHIL make Converter oil pump [SR].consists of 5 items. [i]Terminalbox nitril rubber gasket Pt.no.SH/OPC/15 -1No. [ii] Compression gland complete with cable gland, grommet and washer PT.no.SH/OPC/21 -1 no. [iii] O ring between suctionflange and guide vane Pt.no.SH/OPC/26 -1 No. [iv] O ring between guide vane and shell Pt.No.SH/OPC/28 -1 No. [v] O ring between shell and delivery flangePt.No.SH/OPC/29 -1 No. [2]. Gaskets for SHIL make TFP oil pump. Consists of 4 Items [i] Terminal box nitril rubber gasket pt no. SH/OPC/19 - 1 no [ii] Compression glandcomplete with cable gland, grommet and waher pt no.SH/OPC/16 -1No [iii] O-ring between suction flange and shell pt no. SH/OPC/31-01 NO [iv] O-ring between shell anddelivery flange pt no. SH/OPC/23 - 01 No.
Evaluation Criteria : Itemwise/Consigneewise
Tender Doc: 0.00
Earnest Money (INR): 0.00
Pre-Bid Query Date Time: Not Applicable
Bidding System : Single Bid System
Validity of Offer(Days) : 60
Delivery Schedule : Within 02 to 03 Months.
Inspection Agency: OTHERS (AS PER TENDER DOCUMENT)
Payment Terms : Payment 100 percent against R/NOTE through NEFT/RTGS.
Instructions/Remarks: [1]. Inspection by RITES.[2].Material to be delivered directly to the consignee FOR Destination on door delivery basis.[3]. Drawing and Cost: N/A.[4]. SVC if applicable is to bespecifically quoted. Otherwise, The same will not be paid.[5]In case of delivery by road, date of receipt in the consignees end will be taken as date of delivery.[6]Please refer toECoR documents available in website www.eastcoastrailway.gov.in and www.ireps.gov.in for other terms and conditions.
Documents
Tender Notice