Package P-1 - Construction of Adit-1 Cum Spill Tunnel Alongwith Spill Outfall Structure,... Tender

SJVN LIMITED has floated a tender for Package P-1 - Construction of Adit-1 Cum Spill Tunnel Alongwith Spill Outfall Structure, Adit-2, Adit-3 & Adit-4 to Hrt, Hrt from Sta. 100.00 M to 11865.723 M, Spill Tunnel Gate, Adit-3 Gate and Road..... The project location is Shimla, Himachal Pradesh, India. The reference number is DCB-CCD-LAHEP-P1-434-01 and it is closing on 14 May 2025. Suppliers can request Register free of cost to get the complete Tender details and download the document.

Expired Tender

Procurement Summary

State : Himachal Pradesh

Summary : Package P-1 - Construction of Adit-1 Cum Spill Tunnel Alongwith Spill Outfall Structure, Adit-2, Adit-3 & Adit-4 to Hrt, Hrt from Sta. 100.00 M to 11865.723 M, Spill Tunnel Gate, Adit-3 Gate and Road....

Deadline : 14 May 2025

Other Information

Notice Type : Tender

TOT Ref.No.: 118956014

Document Ref. No. : DCB-CCD-LAHEP-P1-434-01

Financier : Self Financed

Purchaser Ownership : Public

Document Fees : Refer Document

Tender Value : Refer Document

EMD : Refer Document

Purchaser's Detail

Name :Login to see tender_details

Address : Login to see tender_details

Email : Login to see tender_details

Login to see details

Tender Details

Package P-1 - Construction of Adit-1 cum Spill Tunnel alongwith Spill outfall structure, Adit-2, Adit-3 & Adit-4 to HRT, HRT from STA. 100.00 m to 11865.723 m, Spill Tunnel Gate, Adit-3 Gate and Road Works etc. of Lower Arun Hydroelectric Project (669 MW)
Package P-1 : Construction of Adit-1 cum Spill Tunnel alongwith Spill outfall structure, Adit-2, Adit-3 & Adit-4 to HRT, HRT from STA. 100.00 m to 11865.723 m, Spill Tunnel Gate, Adit-3 Gate and Road Works etc. of Lower Arun Hydroelectric Project (669 MW)
Location : Shimla
NIT Date : 01/11/2024
Last Date of Submission : 14/05/2025

Documents

 Tender Notice

P1Section1to7.pdf

P1-Notification-pre-bid.pdf

P1Corrigendum01.pdf

P1Corrigendum2.pdf

P1Corrigendum3.pdf

P1Corrigendum4.pdf

P1Corrigendum5.pdf

P1Corrigendum6.pdf

P1Corrigendum7.pdf

P1Corrigendum8.pdf

P1Corrigendum9.pdf