Procurement Summary
State: Andhra Pradesh
Summary: Engineering, Design and Construction of Viaduct Length 46.23 kms (3 corridors) (including 20.16 Kms of Double Decker 4 Lane Flyover cum Metro Viaduct) and 42 Nos. Elevated Metro stations, etc. all as ...
Deadline: 07 Oct 2025
Other Information
Notice Type: Tender
TOT Ref.No.: 125790710
Document Ref. No.: APMRCL/PROC-VSKP/2025/CW/04
Financier: Self Financed
Purchaser Ownership: Public
Document Fees: Refer Document
Tender Value: Refer Document
EMD: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Corrigendum-2 : Engineering, Design and Construction of Viaduct Length 46.23 kms (3 corridors) (including 20.16 Kms of Double Decker 4 Lane Flyover cum Metro Viaduct) and 42 Nos. Elevated Metro stations, etc. all as specified on EPC basis for Phase-1 of Visakhapatnam Metro Rail, at Visakhapatnam, Andhra Pradesh, India
Engineering, Design and Construction of Viaduct Length 46.23 kms (3 corridors) (including 20.16 Kms of Double Decker 4 Lane Flyover cum Metro Viaduct) and 42 Nos. Elevated Metro stations, etc. all as specified on EPC basis for Phase-1 of Visakhapatnam Metro Rail, at Visakhapatnam, Andhra Pradesh, India
Documents
Tender Notice