Corrigendum: Construction of Iconic Hybrid Cable Stayed and Suspension Bridge Across... Tender
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS has floated a tender for Corrigendum: Construction of Iconic Hybrid Cable Stayed and Suspension Bridge Across Krishna River on Nh 167K Design Chainage Km 87.360 to Km 88.437 in the States of Telangana and Andhra Pradesh on Ep.... The project location is Hyderabad, Telangana, India. The reference number is RW/HYD/Misc-28/NIT/2023-24/007 dt 07.10.2023 and it is closing on 18 Sep 2025.
Suppliers can request Register free of cost to get the complete Tender details and download the document.
Procurement Summary
State: Telangana
Summary: Corrigendum: Construction of Iconic Hybrid Cable Stayed and Suspension Bridge Across Krishna River on Nh 167K Design Chainage Km 87.360 to Km 88.437 in the States of Telangana and Andhra Pradesh on Ep...
Corrigendum: Construction of Iconic Hybrid Cable Stayed and Suspension Bridge Across Krishna River on Nh 167K Design Chainage Km 87.360 to Km 88.437 in the States of Telangana and Andhra Pradesh on Epc Basis
Construction of Iconic Hybrid Cable Stayed and Suspension Bridge Across Krishna River on NH 167K Design Chainage km 87.360 to km 88.437 in the States of Telangana and Andhra Pradesh on EPC Basis
Category: Civil Works - Roads Organisation Chain: Ministry of Road Transport and Highways||P7 Delh - MoRTH||RO Hyderabad - MoRTH
Tender Category: Works
Product Category: Civil Works - Roads
Sub Category: NA
Form Of Contract: EPC Contract
Contract Type: Tender
Bid Validity(Days): 120
Period Of Work(Days): 730
Document Download / Sale Start Date: 07-Oct-2023 03:00 PM
Document Download / Sale End Date: 18-Sep-2025 03:00 PM
Bid Submission End Date: 18-Sep-2025 03:00 PM
Bid Opening Date: 19-Sep-2025 03:00 PM
Tender Value in ₹: 9, 63, 00, 00, 000