Construction of nh-24 extension 4-lane bypass starting from behta road and terminating... Tender
NATIONAL HIGHWAYS AUTHORITY OF INDIA (NHAI) has floated a tender for Construction of nh-24 extension 4-lane bypass starting from behta road and terminating at sitapur road chainage 479.500 (bypass chainage from km 32.000/31.490 to km 64.900/64.380 average length 32.895km) in the state of uttar pradesh under nhdp phase. The project location is New Delhi, Delhi, India. The reference number is and it is closing on 13 Dec 2017.
Suppliers can request Register free of cost to get the complete Tender details and download the document.
Procurement Summary
State : Delhi
Summary : Construction of nh-24 extension 4-lane bypass starting from behta road and terminating at sitapur road chainage 479.500 (bypass chainage from km 32.000/31.490 to km 64.900/64.380 average length 32.895km) in the state of uttar pradesh under nhdp phase
Tenders are invited for Construction of nh-24 extension 4-lane bypass starting from behta road and terminating at sitapur road chainage 479.500 (bypass chainage from km 32.000/31.490 to km 64.900/64.380 average length 32.895km) in the state of uttar pradesh under nhdp phase-vii-package 2 on epc mode. (package-ii)