Procurement Summary
State: Assam
Summary: Turnkey Contract for Supply, Installation and Commissioning of Plant & Equipment Along with Related Infrastructure and Operation of Mechanized Laundry at Dbrg, Collection of Soiled Linen from Coaches....
Deadline: 20 Jul 2026
Posting Date: 24 Jun 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 143900190
Document Ref. No.: M-TSK-2026-19
Financier: Self Financed
Purchaser Ownership: Public
Document Fees: Refer Document
Tender Value: ₹ 1768239968.17
EMD: ₹ 8991200.00
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Turnkey contract for supply, installation and commissioning of Plant & Equipment along with related infrastructure and operation of Mechanized Laundry at DBRG, collection of soiled linen from coaches at DBRG, NTSK and TSK Railway Stations and loading of washed linen in coaches at DBRG, NTSK and TSK Railway Stations for a period of 10 years under BOOT (Build-Own-Operate-Transfer) Model.
Collection of soiled linen (consisting of bed sheets, pillow covers, towels), dohar, blanket, blanket covers, curtains etc from nominated coaches from nominated locations, transportation to laundry, washing, drying, ironing and delivery of packed linen items in sets and other items at nominated locations as per Scope of Work under BOOT Model. 2 2 6703752.0 0 Numbers 12.98 87014700.96 AT Par 87014700.96 Rs.
Contract Type : Service - General
Tender Type : Open
Advertised Value : 1768239968.17
Bidding Style : Single Rate for Each Schedule Item
Bidding System : Two Packet System
Pre-Bid Required : Yes
Pre-Bid Query Date Time :
Tendering Section : TENDER
Bidding Unit :
Publishing Date / Time : 05/06/2026 17:01
Period Of Completion : 130 Months
Bidding Start Date : 06/07/2026
Closing Date Time : 20/07/2026 15:00
Validity of Offer ( Days) : 180
Are Joint Venture (JV) firms allowed to bid : Yes
Tender Doc. Cost (Rs.) : 0.00
Earnest Money (Rs.) : 8991200.00
Documents
Tender Notice
viewNitPdf_5420260.pdf
Corrigendum.pdf
BOOTFinalTenderDocument.pdf