Procurement Summary
State : Chhattisgarh
Summary : Survey, Design, Foundation, Supply, Erection, Installation, Testing and Commissioning of Towers for Kavach in Low Density Route (1563 Rkm) of South East Central Railway.
Deadline : 20 Jan 2025
Other Information
Notice Type : Tender
TOT Ref.No.: 112125260
Document Ref. No. : 79-SNT-PROJ-TENDER-2024
Financier : Self Financed
Purchaser Ownership : Public
Document Fees : Refer Document
Tender Value : ₹ 1112312550.00
EMD : ₹ 5711600.00
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
Lattice tower (40 Meter) foundation, tower fabrication, tower erection including survey, soil investigation, design, drawings, testing, supply, transportation, storage, painting, Aviation Lamp & Lighting arrangment, earthing and fencing as per RDSO Drawing No. RDSO/TC/TOWER/L/40/180/T/6.5(8 Sheets). This includes supply, transportation, erection of Outdoor Cabinet on suitable foundation as per Annexure-I. Approved 40m Lattice tower foundation drawings & GAD are attached with Tender Document. Inspection of tower material shall be ensured from RITES at the Contractor's/Manufacturer's premises before supply of material to Railways.
Contract Type : Works
Tender Type : Open
Advertised Value : 1112312550.00
Bidding Style : Single Rate for Each Schedule
Bidding System : Two Packet System
Pre-Bid Required : Yes
Pre-Bid Query Date Time : 30/12/2024 08:00
Tendering Section : PROJECT II
Bidding Unit :
Publishing Date / Time : 19/12/2024 18:34
Period Of Completion : 18 Months
Bidding Start Date : 06/01/2025
Closing Date Time : 20/01/2025 12:30
Validity of Offer ( Days) : 90
Are Joint Venture (JV) firms allowed to bid : -
Tender Doc. Cost (Rs.) : 0.00
Earnest Money (Rs.) : 5711600.00
Documents
Tender Notice
viewNitPdf_4804584.pdf
40MLatticeTowerdrawing.pdf
40MLatticeTowerGAD.pdf
RDSO180k6.5NCFoundation_Drawing_with_Water_Table_1.pdf
RDSO180k6.5NCFoundation_Drawing_without_Water_Table_2.pdf
Ann-I.pdf
GCC-Apr-2022.pdf
GCCCorrectionSlipsUpto7.pdf
ScopeofWorkTechnicalDetailsLDN_1.pdf
PREBIDCONFERENCE.pdf
SpecialConditionofContract-Tower.pdf