Supply, Installation and commissioning of Plantar pressure analyzer with spatio-temporal... Tender
COUNCIL OF SCIENTIFIC AND INDUSTRIAL RESEARCH (CSIR) has floated a tender for Supply, Installation and commissioning of Plantar pressure analyzer with spatio-temporal parameters, Qty: 4 Nos, (BOQ Item #1). The project location is Kanpur Nagar, Uttar Pradesh, India. The reference number is - and it is closing on 05 Dec 2025.
Suppliers can request Register free of cost to get the complete Tender details and download the document.
Procurement Summary
State: Uttar Pradesh
Summary: Supply, Installation and commissioning of Plantar pressure analyzer with spatio-temporal parameters, Qty: 4 Nos, (BOQ Item #1)