Procurement Summary
State: Uttar Pradesh
Summary: S&T Work I.C.W Improvement of Earthing Arrangements as Per Latest Rdso Guidelines No.- Rdso-Sig0spd(Proj)/1/2020, Dated 01.01.2025 over Lko Division of Northern Railways.
Deadline: 06 Apr 2026
Posting Date: 17 Mar 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 137925542
Document Ref. No.: 106-Sig-Tender-69-2025-26
Financier: Self Financed
Purchaser Ownership: Public
Document Fees: Refer Document
Tender Value: ₹ 52842608.35
EMD: ₹ 414200.00
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Supply of basic material to construct Maintenance Free Earth for Ring Earth consisting as per Speciï¬cation No.RDSO/SPN/197/2016 Ver 1.0 or latest & as per RDSO TAN letter No- RDSO-SIGEnB (GEN)/1/2020 dated 30.06.2025 or latest, bonding connections drawing no. SDO/RDSO/E&B/002. (a) Copper bonded steel electrodes of 3.0 m long, 17.0mm dia. minimum with copper bonding thickness of min 250micron and UL listed and marked-1 No. (b) Earth Enhancement compound of RDSO approved brand supplied in sealed bags of min 30-35 Kg.- 1 Nos. (c ) Copper Strip of 200mm x 25mm x 6mm to exothermically welded to Earth electrode- 1no.(d) Copper Strip of 300mm x 25mm x 6mm (MEEB) -1no.(e) Copper Strip of 150mm x25mm x 6mm (SEEB)- 1no. Inspection by RDSO for supply portion. 02 02 806.00 Set 5087.17 4100259.02 AT Par 4100259.02
Contract Type : Works - General
Tender Type : Open
Advertised Value : 52842608.35
Bidding Style : Single Rate for Tender
Bidding System : Single Packet System
Pre-Bid Required : No
Pre-Bid Query Date Time :
Tendering Section : SIGNAL
Bidding Unit : Above/Below/Par
Publishing Date / Time : 16/03/2026 18:32
Period Of Completion : 365 Days
Bidding Start Date : 23/03/2026
Closing Date Time : 06/04/2026 15:30
Validity of Offer ( Days) : 60
Are Joint Venture (JV) firms allowed to bid : No
Tender Doc. Cost (Rs.) : 0.00
Earnest Money (Rs.) : 414200.00
Documents
Tender Notice
viewNitPdf_5322592.pdf
GCC_April-2022_1.pdf
ACSGCC22-231to6.pdf
GCCAdvanceCorrectionSlipno7-10.pdf
GCCACS11.pdf
TD-69-2025-26Earthingarrangement16.03.2026.pdf