Procurement Summary
State: Maharashtra
Summary: S&T Related Cable Shifting/Utility Shifting for Facilitated Engineering Earth Work for Construction of Fencing /Rob/Rub/Lhs /Drain /Bridges Repairing Etc. in Gondia-Durg Section in Nag Division of Sec...
Deadline: 09 May 2026
Posting Date: 19 Apr 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 139787662
Document Ref. No.: ST-Tender-Cable-Shifting
Financier: Self Financed
Purchaser Ownership: Public
Document Fees: Refer Document
Tender Value: ₹ 4906871.58
EMD: ₹ 98100.00
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
S&T related cable shifting/utility shifting for facilitated engineering earth work for construction of fencing /ROB/RUB/LHS /Drain /Bridges repairing etc. in Gondia-Durg section in NAG division of SECR.
Excavation of trenches of following depth and width at the bottom of the trench including clearing of roots bushes etc. for all types of soils including morrum, hard soil mixed with boulders etc. This work include back ï¬lling the trench, ramming, consolidation of soil as well as disposal of extra soil after cable is placed in the trench. After mansoon the route is to be attended for back ï¬lling the rain cuts, wash out of soils where ever found.Depth 1.0 Mtr. & Width 0.3Mtr. work is to be executed as per the advice of Railway site engineer. 2 0 15.00 Kilometre 16479.00 247185.00 AT Par 247185.00
Contract Type : Works - General
Tender Type : Open
Advertised Value : 4906871.58
Bidding Style : Single Rate for Each Schedule
Bidding System : Single Packet System
Pre-Bid Required : No
Pre-Bid Query Date Time :
Tendering Section : CHOS
Bidding Unit :
Publishing Date / Time : 18/04/2026 15:41
Period Of Completion : 6 Months
Bidding Start Date : 25/04/2026
Closing Date Time : 09/05/2026 14:00
Validity of Offer ( Days) : 60
Are Joint Venture (JV) firms allowed to bid : No
Tender Doc. Cost (Rs.) : 0.00
Earnest Money (Rs.) : 98100.00
Documents
Tender Notice
viewNitPdf_5361105.pdf
CorrectedFinal_GCC_April-22140722_compressed.pdf
DailymaintenanceRegisterforworkcontracts_0001.pdf
ImplementationofContractors-eBookMB_compressed.pdf
Newannexure-6sample_compressed.pdf
LetterofLC.pdf
AnnexureNBidsecuritydeclarationN.PDF