Procurement Summary
State: Delhi (NCT)
Summary: Repair of the Rainwater Harvesting Tank, Providing and Fixing of Cgi Sheets, Vitrified Floor Tiles, False Ceiling, Roller Blinds, Distempering, and other Miscellaneous Allied Civil Works at Cris Offic...
Deadline: 13 Jul 2026
Posting Date: 23 Jun 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 143840098
Document Ref. No.: CRIS_CIVIL_2025_07
Financier: Self Financed
Purchaser Ownership: Public
Document Fees: Refer Document
Tender Value: ₹ 1571119.21
EMD: ₹ 31400.00
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Repair of the Rainwater Harvesting Tank, Providing and fixing of CGI Sheets, Vitrified Floor Tiles, False Ceiling, Roller Blinds, Distempering, and Other Miscellaneous Allied Civil Works at CRIS Offices in Chanakyapuri & SC Metro Station, New Delhi.
DSR 2023 : Item No. 15.7 :- 15.7.4 :- Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge.:- In cement mortar S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit Schedule () 02-DSR 2023 : Item No. 2.6 :- 2.6.1 :- 1065.00 02 DSR2023 6.00 cum 177.50 1065.00 AT Par 1065.00
Contract Type : Works - General
Tender Type : Open
Advertised Value : 1571119.21
Bidding Style : Single Rate for Tender
Bidding System : Single Packet System
Pre-Bid Required : No
Pre-Bid Query Date Time :
Tendering Section : CIVIL WORK
Bidding Unit : Above/Below/Par
Publishing Date / Time : 23/06/2026 12:03
Period Of Completion : 90 Days
Bidding Start Date : 29/06/2026
Closing Date Time : 13/07/2026 15:00
Validity of Offer ( Days) : 90
Are Joint Venture (JV) firms allowed to bid : No
Tender Doc. Cost (Rs.) : 0.00
Earnest Money (Rs.) : 31400.00
Documents
Tender Notice
viewNitPdf_5117808.pdf
GCC-2022.pdf
STD-2022_1.pdf
GCC-2022withCSupto10_2.pdf
Annexure-V.pdf
CECIRCULAR630.pdf
2026_03_13IndianRailwaysStandardGeneralConditionsofContractApril2022AdvanceCorrectionSlipNo_1111_compressed.pdf