Procurement Summary
State: Rajasthan
Summary: Rebuilding / Rehabilitation/ Strengthening of Bridges (Up Line) in Connection with Running of Higher Loads and Higher Speed (678, 732, 739, 775, 787, 846 Etc. Bridges) & Replacement of Existing Slab Bridge...
Deadline: 06 Jul 2026
Posting Date: 17 Jun 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 143457614
Document Ref. No.: 85-2026
Financier: Self Financed
Purchaser Ownership: Public
Document Fees: Refer Document
Tender Value: ₹ 55382470.94
EMD: ₹ 1107700.00
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Rebuilding / Rehabilitation/ strengthening of bridges (up line) in connection with running of higher loads and higher speed (678, 732, 739, 775, 787, 846 etc. bridges) & Replacement of Existing slab Bridge No. 366A, Ballast retainer replacement and widening of Major Bridge no. 391, UP line, Providing CC flooring, curtain wall, drop wall, inspection steps, pitching, standard bridge tablets & ballast retaining wall in bridge approaches on various major & minor bridges of Madar-Palanpur Section.
CPWD DSR ITEMS 2023 S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit Schedule () B-IRUSSOR ITEMS 2021 43193282.25 1 Please see Item Breakup for details. 44718171.91 (-) 3.41 43193282.25
Contract Type : Works - General
Tender Type : Open
Advertised Value : 55382470.94
Bidding Style : Single Rate for Tender
Bidding System : Single Packet System
Pre-Bid Required : No
Pre-Bid Query Date Time :
Tendering Section : SR.DEN W
Bidding Unit : Above/Below/Par
Publishing Date / Time : 11/06/2026 19:51
Period Of Completion : 24 Months
Bidding Start Date : 22/06/2026
Closing Date Time : 06/07/2026 15:00
Validity of Offer ( Days) : 60
Are Joint Venture (JV) firms allowed to bid : No
Tender Doc. Cost (Rs.) : 0.00
Earnest Money (Rs.) : 1107700.00
Documents
Tender Notice
viewNitPdf_5416164.pdf
TenderForm85-2026.pdf
Terminationletter.pdf
RailwayBoardJPOCableCut03062024.pdf
GCC-2022-ACS10_compressed.pdf
Listofpreferredmakebrands.pdf
BridgeMaintanceperiod48months.pdf
ACS11_compressed.pdf
BridgeSpclCondition.pdf