Procurement Summary
State: Delhi (NCT)
Summary: Pre-feasibility study for the 70 kilo-tons per annum (KTPA) Green Ammonia Project in Dhulet, MP
Deadline: 15 Jul 2026
Posting Date: 26 Jun 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 144073740
Document Ref. No.: 0002022733
Financier: World Bank (WB)
Purchaser Ownership: Public
Document Fees: Refer Document
Tender Value: Refer Document
EMD: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Assignment Overview:Assignment Title: Pre-feasibility study for the 70 kilo-tons per annum (KTPA) Green Ammonia Project in Dhulet, Madhya Pradesh, India. Assignment Countries: India Brief Assignment Description:India-s National Green Hydrogen Mission (NGHM) sets an ambitious target of establishing 5 million metric tons per annum (MMTPA) equivalent of green hydrogen production capacity in India by 2030. NTPC Limited is one of the most active players in this space. NTPC, through its subsidiary NTPC Green Energy Limited (NGEL), proposes to develop a 70 kilotons per annum (KTPA) green ammonia plant in Dhulet, Madhya Pradesh, on 40 acres of land, with an estimated investment of INR 1, 400 crore. This plant will require round-the-clock supply from 110 megawatts (MW) of renewable energy generation. NGEL won this bid under the green ammonia auctions conducted by the Solar Energy Corporation of India Limited (SECI). The off-taker for the green ammonia is M/s Krishna Phoschem Limited in Meghnagar, Madhya Pradesh (MP), at a discovered tariff of INR 51.80/kg of green ammonia. At the request of the Government of India (GoI), the World Bank has already supported NGHM through a two-phased US$3 billion low-carbon energy programmatic development policy lending operation to deepen the policy and regulatory ecosystem around green hydrogen. As part of further deepening the market for green hydrogen and its derivatives, including green ammonia, engagement with NGEL will be an important step. This is particularly important because the lack of experience in deploying several of these technologies at scale, both in India and globally, is considered a major constraint by various developers, financiers, and other stakeholders. The World Bank will support NGEL in exploring the development of various green hydrogen initiatives, including the proposed project in MP. The World Bank intends to hire a consulting firm, or a consortium, to support this assignment. The key objective of the assignment ...
Documents
Tender Notice
Expression-of-Interest-MP-Project-Abridged.docx