Procurement Summary
State: Chhattisgarh
Summary: Improvement to Raipur Water Works Including 3 Months Trial Run, 12 Months Defects Liability Period and 5 Years Operation and Maintenance of all Project Components/Whole Scheme.I. Providing and Construc...
Deadline: 25 Aug 2026
Posting Date: 07 Aug 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 146787048
Document Ref. No.: 195584
Financier: Self Financed
Purchaser Ownership: Public
Document Fees: Refer Document
Tender Value: Refer Document
EMD: ₹ 7500000.00
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Improvement To Raipur Water Works Including 3 Months Trial Run, 12 Months Defects Liability Period And 5 Years Operation And Maintenance Of All Project Components/Whole Scheme.I. Providing And Constructing 16.00 M Dia Intake Well Cum Pump House On Bank Of Kharun River With Rcc Approach Bridge Of 50 M In Length Near Kathadih..Ii. Providing And Installing Raw Water Pumping Machinery 6 Nos. (4W + 2S) Of Q=1705110Lph And Head 58 M.Iii. Construction Of Electric Sub Station Of 2000/33/3.3 Kva Out Door At Intake Well Site.Iv. Providing And Laying Di K-9 Raw Water Pumping Main (Dia: 1200 Mm & Total Length: 6500 Rmt) Up To Wtp At Dunda.V. Conventional Water Treatment Plant Of Capacity 150 Mld With Lamella Clarifier And Recirculation Arrangement Including Conference Cum Scada Room And Aluminium Composite Panel Cladding With Frame On All 4 Sides Of All Major Buildings Opposite Dunda School.Vi. Construction Of Electric Sub Station Of 5000/33/3.3 Kva Out Door At Wtp Site.Vii. Providing And Installing Clear Water Pumping Machinery 6 Nos. (4W + 2S) Of Q=1, 710909 Lph And Head 96 M At Wtp.Viii. Providing And Laying Di K-9 Clear Water Pumping Main Of 1200 Mm Dia Of Total Length 5500 Rmt) From Wtp Junction Point At Santoshi Nagar Raipur.Ix. Providing And Installing Bulk Flow Meter On Raw Water Pumping Main.X. Other Allied Works (Boundary Wall, Staff Quarter, Planitation, Land Scaping, Rain Water Harvesting Etc.).Xi. Plc & Iot Based Scada For All Components.Note:The Quoted Lump Sum Offer By Contractor Shall Be Deemed To Be Included Of All The Cost Required For Successful Survey, Engineering, Design, Supply, Installation, Testing And Commissioning Of Whole Scheme Including Mechanical, Electrical, Plc, Iot Base Scada, Instrumentations Equipment's Along With Any Other Required Components For The Successful Operation Of The Plant And Cost Of Operation & Maintenance For 5 Years. The Department Will Not Entertain Any Extra Financial Claim On Account Of Extra Items, It Is Solely The Responsibi...
ATTRIBUTE(S): Bid Validity Period (In Days) 120
Tender / Work Completion Time (In Months) 24.00
Required Past Technical Experience As Per Nit
Required Financial Turnover (In Inr) As Per Nit
Required Bid Capacity (In Inr) As Per Nit
Date-Time Detail(s): Bid Submission Start date 15 Jul, 2026 8:00:00 PM IST Bid Due Date 25 Aug, 2026 5:30:00 PM IST
Bid Open Date (Scheduled) 1 Sep, 2026 11:00:00 AM IST Physical Doc Submission End Date 31 Aug, 2026 5:30:00 PM IST
TIME LEFT 18d 1h 27m