1 |
Chain Link Fabric fence at Zochachhuah |
Construction of Chain link febric fence |
170 |
rm |
180 |
|
2 |
Supply and Fixing of 60W LED Solar Street Light at Zochachhuah Crossing Point |
Supply and fixing of LED solar street Light at Crossing Point |
32 |
Job |
180 |
|
3 |
Construction of Random Rubble masonry retaining wall at Zochachhuah Crossing Point |
Retaining wall to hold back soil |
33 |
Mtr |
180 |
|
4 |
Construction of Footpath and Steps at Zochachhuah Crossing Point |
Footpath and Steps for routes |
50 |
rm |
180 |
|
5 |
Construction of drainage system at Zochachhuah Crossing Point |
Drainage system to safely remove excess water and wastewater |
40 |
Mtr |
180 |
|
6 |
Construction of Boundary Wall at Namlee Crossing Point |
Boundary wall to enhance security |
600 |
rm |
180 |
|
7 |
Construction of Internal Road at Namlee Crossing Point |
Internal Road to provides access, circulation, and connectivity |
100 |
rm |
180 |
|
8 |
Construction of Retaining Wall at Namlee Crossing Point |
Retaining wall to hold back soil |
4530 |
cm |
180 |
|
9 |
Construction of Storm drainage at Namlee Crossing Point |
Drainage system to safely remove excess water and wastewater |
150 |
rm |
180 |
|
10 |
Provision of PCC footpath with chequered tiles at Namlee Crossing Point |
PCC footpath with chequered tiles for entrance ramps |
140 |
rm |
180 |
|
11 |
Construction of Paver Block at Namlee Crossing Point |
Paver Block for exterior flooring |
150 |
Sqm |
180 |
|
12 |
Provision of earthwork in excavation at Namlee Crossing Point |
Earthwork in excavation for levelling |
1860 |
Cubic Meter |
180 |
|
13 |
Supply and Installation of Sentry Post at Namlee Crossing Point |
Sentry Post for security purpose |
5 |
Job |
180 |