WEST BENGAL GREEN ENERGY DEVELOPMENT CORPPRATION LTD has floated a tender for Design, Engineering, Supply, Installation, Testing, Commissioning of 40 Kw/100 Kwh Battery Energy Storage System (Bess) with Integrated Ev Charging Infrastructure (2 x 7.4 Kw Ac) at Bikalpa Shakti Bha.... The project location is Kolkata, West Bengal, India. The reference number is - and it is closing on 10 Dec 2025.
Suppliers can request Register free of cost to get the complete Tender details and download the document.
Procurement Summary
State: West Bengal
Summary: Design, Engineering, Supply, Installation, Testing, Commissioning of 40 Kw/100 Kwh Battery Energy Storage System (Bess) with Integrated Ev Charging Infrastructure (2 x 7.4 Kw Ac) at Bikalpa Shakti Bha...