Procurement Summary
State: West Bengal
Summary: Design and Preparation of Signal Interlocking Plan, Automatic Fat Testing for Ei of any Oem with Indigenous Software, Checking & Verification of Interface Circuit, Application Logic & Toc/Rcc at 02Lev...
Deadline: 29 May 2026
Posting Date: 01 May 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 140494783
Document Ref. No.: ST-PROJ-1-CKP-drawin
Financier: Self Financed
Purchaser Ownership: Public
Document Fees: Refer Document
Tender Value: ₹ 38362766.94
EMD: ₹ 767300.00
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Design and preparation of signal interlocking Plan, Automatic FAT testing for EI of Any OEM with indigenous software, Checking & Verification of Interface Circuit, Application Logic & TOC/RCC at 02level by IRSE/IRSTELO Licence holder for stations as personal practice of South Eastern Railway
Checking and Testing of EI Documents (Item Directory - Not Applicable) S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit Schedule () F2-Design, Preparation of Signalling Interlocking Plan as per Draft/Tentative/Approved EngineeringScale Plans(ESP) 3714095.24 Above/ Below/P ar 2 Please see Item Breakup for details. 3714095.24 AT Par 3714095.24
Contract Type : Works - General
Tender Type : Open
Advertised Value : 38362766.94
Bidding Style : Single Rate for Each Schedule
Bidding System : Single Packet System
Pre-Bid Required : No
Pre-Bid Query Date Time :
Tendering Section : CSTE PROJ
Bidding Unit :
Publishing Date / Time : 30/04/2026 13:20
Period Of Completion : 12 Months
Bidding Start Date : 15/05/2026
Closing Date Time : 29/05/2026 15:00
Validity of Offer ( Days) : 60
Are Joint Venture (JV) firms allowed to bid : No
Tender Doc. Cost (Rs.) : 0.00
Earnest Money (Rs.) : 767300.00
Documents
Tender Notice
viewNitPdf_5376099.pdf
Tenderdocsofdesignanddrawing.pdf
ACS8GCC.pdf
ACS9GCC.pdf
ACS10GCC.pdf
ACS11GCC.pdf
AUTOSECTIONFATPROCEDURES1.pdf
GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27_04_22.pdf