NTPC LIMITED has floated a tender for Corrigendum: Supply Installation Testing and Commissioning of 50 Kw off Grid Solar Pv Power Plant Complete with Battery Energy Storage System at Ayodhya. The project location is Ambedkar Naga, Uttar Pradesh, India. The reference number is NTPC/USSC-CPG3/9900334660 and it is closing on 26 Oct 2026.
Suppliers can request Register free of cost to get the complete Tender details and download the document.
Procurement Summary
State: Uttar Pradesh
Summary: Corrigendum: Supply Installation Testing and Commissioning of 50 Kw off Grid Solar Pv Power Plant Complete with Battery Energy Storage System at Ayodhya