1 |
Boiler repairing and parts |
As per attached detailed specification |
1 |
NOS |
15 |
|
2 |
Boiler service |
As per attached detailed specification |
1 |
NOS |
15 |
|
3 |
Boiler pipe line old Dismantling Work |
As per attached detailed specification |
1 |
MTR |
15 |
|
4 |
MS pipe 1 inch |
As per attached detailed specification |
50 |
MTR |
15 |
|
5 |
MS pipe Fabrication |
As per attached detailed specification |
50 |
MTR |
15 |
|
6 |
MS. pipe aluminum insulation Dismantling work |
As per attached detailed specification |
50 |
MTR |
15 |
|
7 |
MS. pipe aluminum insulation new work aluminum insulation installation |
As per attached detailed specification |
50 |
MTR |
15 |
|
8 |
Instant plant half framing Dismantling |
As per attached detailed specification |
1 |
NOS |
15 |
|
9 |
Instant plant S.S. Fabrication |
As per attached detailed specification |
40 |
MTR |
15 |
|
10 |
GI Sheets |
As per attached detailed specification |
5 |
NOS |
15 |
|
11 |
SS. 304 box pipe GI seats fabrication work Argon Welding work |
As per attached detailed specification |
2 |
MTR |
15 |
|
12 |
Instant plant new parts |
As per attached detailed specification |
2 |
NOS |
15 |
|
13 |
Instant plant fabrication work |
As per attached detailed specification |
2 |
NOS |
15 |
|
14 |
Instant plant reinstall |
As per attached detailed specification |
1 |
NOS |
15 |
|
15 |
S.S. 304 band, union |
As per attached detailed specification |
2 |
NOS |
15 |
|
16 |
Milk pasteurizer Plant gas kit |
As per attached detailed specification |
50 |
NOS |
15 |
|
17 |
Milk pasteurizer Plant |
As per attached detailed specification |
1 |
NOS |
15 |
|
18 |
Milk packing machine |
As per attached detailed specification |
1 |
NOS |
15 |
|
19 |
Boiler valve |
As per attached detailed specification |
5 |
NOS |
15 |
|
20 |
Other |
As per attached detailed specification |
1 |
NOS |
15 |