Procurement Summary
State: -
Summary: Contract notice: Parking lot construction work
Deadline: 08 Aug 2018
Posting Date: 13 Jul 2018
Other Information
Notice Type: Tender
TOT Ref.No.: 24973315
Document Ref. No.: 302036-2018
Financier: Self Financed
Purchaser Ownership: -
Document Fees: Refer Document
Tender Value: Refer Document
EMD: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Object of the contract
Parking lot construction work
Description: Contract notice: Parking lot construction work
Authority Type: Other
Contact Nature: Works
Procedure: Restricted procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 45223300, 45223300
CPV Description: Parking lot construction work.
Restricted procedure for the executive planning and realization of the completion works of the public multi-storey car park P2 c and of the adjacent lot C of the tunnel pp.ss.
Reference Number: CIG: 7558175352; CUP: I81G03000000007
The procedure is aimed at the awarding of a contract, pursuant to art. 1, comma 2, lett. e) and of the art. 59, paragraph 1, of the DLgs. n. 50/2016 and s.m.i., for the executive planning and execution of the works concerning the completion works of the public multi-storey car park P2 c and the adjacent lot C of the tunnel pp.ss. More details on this will be provided in the tender documentation that will be attached to the letter of invitation.
Main Site: Rome.
Contract for the executive planning and executionand of the works concerning the completion works of the public multi-storey parking lot P2 and the adjacent lot C of the pp.ss. cunicle. The units of technical staff estimated for the carrying out of the design activities are equal to 5 (five). The participants, under penalty of exclusion, must meet the following requirements:
a) entry in the register of companies or, in case of competitors not established in Italy, in the professional or commercial register established in the country of origin, for the activities covered by the present competition;
b) inexistence of the causes of exclusion pursuant to art. 80 of Legislative Decree no. 50/2016 s.m.i.; c) non-existence of the prohibition pursuant to art. 53, paragraph 16-ter, of Legislative Decree 165/2001. In the case in which the manufacturer subject has recourse tod an external designer (among the subjects indicated in Article 46 of Legislative Decree No. 50/2016 and subsequent amendments), it will also be necessary for the latter to certify, also by completing the DGUE, the possession of the requisites indicated in the previous letters a), b) and c). In the hypothesis of recourse to a professional individual, in place of the reference to the registration in the business register, must beand provided the indication of the qualification and the details of the enrollment to the competent professional order (DGUE part IV letter A point 2).
In the hypothesis of recourse to associated studies or companies of professionals or engineering companies, the aforementioned subjects they must also indicate the name (s) of the designer (s) who will carry out the executive planning / year, providing an indication of the-qualification and details of enrollment in the competent professional association (DGUE part IV letter A point 2).
The permanent consortia of professional and engineering companies associated or indicated by the manufacturer, as well as certifying through the DGUE the possession of the requirements of the previous letters a), b) and c), must indicate the consortium entity for which theconsortium competes. The consortium member indicated must, in turn, under penalty of exclusion of the consortium, certify through the DGUE the possession of the requisites as per the previous letters a), b) and c), and indicate the designer (s) who will carry out / year the executive design, the relative qualification and the details of the / relative registration (s) to the competent professional association (DGUEpart IV letter A point 2). a) certification of SOA qualification for design and construction, in the course of validity, for the OG 1 category, ranking V.
Without possession of the aforementioned qualification certification for design and construction, with reference to the design activities, the companies must still be in possession, under penalty of exclusion, of the requirements referred to inthe next letter b1) by its technical design staff. The aforementioned requirement is indicated in the following point III.1.3. of this announcement.
Companies without SOA qualification for design activities or whose technical staff is not in possession of the requisite required by the subsequent letter. b1) must, under penalty of exclusion, associate in RTI or indicate in offer one ormore designers (among the subjects indicated in Article 46 of Legislative Decree No. 50/2016 and subsequent amendments), for the purpose of drafting the executive project. The designers, in turn, always under penalty of exclusion, must possess the requisites indicated in letter b), indicated in the following point III.1.3) of this announcement.
This procedure is called by the art. 3, paragraph 1, lett. g) of D.Lgs. 50/2016, ie a private entity that, as a management company of the U-TURN fund, as part of the urban transformation program Eur-Castellaccio directly assumes the execution of the urbanization works in to the urban planning convention of 22.12.2003, rep. 98 556, racc. 31 944, as supplemented by the supplementary planning agreement of 20.5.2008, rep. 108 735, racc. 380 634, pursuant to art. 1, comma 2, lett. e) of Legislative Decree no. 50/2016 and s.m.i., acting as the implementing entity of the agreement.
For the purpose of entrusting the works relating to the urbanization works, these subjects, pursuant to art. 1, comma 2, lett. e) of Legislative Decree no. 50/2016 and s.m.i., are required to carry out public procedures in compliance with dethe provisions pursuant to Legislative Decree no. 50/2016 and smi
The rules, supplementary to this announcement, with regard to the methods for completing and submitting the offer, the documents to be submitted in support of the same and the procedure for awarding the contract will be indicated in the letter of invitation that the contracting entity will send it to competitors who have passed the pre-qualification phaseThe economic operators who fail to meet the requirements of this announcement will be sent a notice of non-admission to the submission phase of the offer. It is possible to resort to the transfer in compliance with the provisions of art. 89 of Legislative Decree no. 50/2016 and s.m.i. It is specified that in case of recourse to the transfer, the auxiliary company will have toto present the DGUE certifying the possession of the general requirements referred to in point III.1.1), as well as the requirements referred to in the previous point (s) III.1.2) and / or III.1.3), limited to the referred to in letter b1), which are the subject of the contract of use.
Participants can ask Bnp Paribas REIM SGR for any clarifications and / or formulate questionsdoses to the person in charge of the procedure, arch. Sergio Meazza, at the telephone number and e-mail address indicated in the contact points referred to in point I.1) of this announcement.
In any case both the questions formulated by the participants and the answers provided will be published anonymously on the website: (http://www.reim.bnpparibas.it), in the section dedicated to this procedure.
The documentnecessary for the submission of the application for participation in this procedure and downloadable on the website (http://www.reim.bnpparibas.it), in the section dedicated to this procedure.
Internet address (URL): www.reim.bnpparibas.it
Documents
Tender Notice