Procurement Summary
State: West Bengal
Summary: Asansol Division: Telecom Work in Connection with Phase-2, Smart Classroom at Electric Training Centre, Asansol and Construction of Igot Traning Center Cum Computer Based Test at Electric Training Cen...
Deadline: 07 May 2026
Posting Date: 16 Apr 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 139606494
Document Ref. No.: 04-SDSTE-ASN-2026-27
Financier: Self Financed
Purchaser Ownership: Public
Document Fees: Refer Document
Tender Value: ₹ 8243335.03
EMD: ₹ 164900.00
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Asansol Division: Telecom Work In connection with Phase-2, Smart Classroom at Electric Training Centre, Asansol and Construction of IGOT traning center cum Computer Based Test at Electric Training Centre, Asansol.
Supply of CAT6 U/UTP Cable for Indoor use, 4-pair unshielded twisted pair (UTP) cable, FR PVC Jacket, High Density Polyethylene insulation, 23 AWG solid copper conductor for superior conductivity, Conductor diameter:0.57 mm (23 AWG), supports Gigabit Ethernet (1000 Base-T) standard, Make -Molex/DLINK/similar, Inspection:Consignee. 2 A 1.00 Numbers 15147.00 15147.00 AT Par 15147.00
Contract Type : Works - General
Tender Type : Open
Advertised Value : 8243335.03
Bidding Style : Single Rate for Each Schedule
Bidding System : Single Packet System
Pre-Bid Required : No
Pre-Bid Query Date Time :
Tendering Section : S AND T
Bidding Unit :
Publishing Date / Time : 15/04/2026 15:35
Period Of Completion : 18 Months
Bidding Start Date : 23/04/2026
Closing Date Time : 07/05/2026 14:00
Validity of Offer ( Days) : 60
Are Joint Venture (JV) firms allowed to bid : No
Tender Doc. Cost (Rs.) : 0.00
Earnest Money (Rs.) : 164900.00
Documents
Tender Notice
viewNitPdf_5251326.pdf
Annexure-A_1.pdf
TELE-BOX-QuadTerminationBox_2025latest_1.pdf
CABLECUT_DiggingJPO_12.08.2024_1.pdf
AnnexureB.pdf
GCC_April-2022.pdf
TenderDocument_SnT.pdf
2022_CE-I_CT_GCC-2022Policy14.07.2022.pdf
ACS-2toGCC-2022_2022-CE-1-CT-GCC-2022-POLICY_13.12.20221.pdf
mergedGCCCorrectionslip3456.pdf
MergedGCCCorrectionSlip78910_1.pdf
2018-CE-I-CT-9dtd.pdf
Annexure-C.pdf
AllAnnexure.pdf
CheckList.pdf
GCCCorrectionslip11.pdf
JPO_telecompolicycircular108_cableroutemarker_1.pdf