Procurement Summary
State: West Bengal
Summary: Asansol Division: Comprehensive Annual Maintenance Contract (Camc) of Amara Raja Make Ips (07 Nos.) at Asn Jn. Cabin, Ult/Lc, Rnpr, Vds, Jsme/Wc, Kjme & Mmd with Oem / Authorized Dealer of Oem for Thr...
Deadline: 07 Aug 2026
Posting Date: 17 Jul 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 145336899
Document Ref. No.: 35-SDSTE-ASN-2026-27
Financier: Self Financed
Purchaser Ownership: Public
Document Fees: Refer Document
Tender Value: ₹ 3099358.08
EMD: ₹ 62000.00
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Asansol Division: Comprehensive Annual Maintenance Contract (CAMC) of Amara Raja Make IPS (07 Nos.) at ASN Jn. Cabin, ULT/LC, RNPR, VDS, JSME/WC, KJME & MMD with OEM / Authorized dealer of OEM for three years.
Comprehensive Annual Maintenance of Amara Raja Power System Ltd. make IPS (7 nos.) at ASN Jn. cabin, ULT/LC, RNPR, VDS, JSME/WC, KJME & MMD for Three years, i.e., for 12 quarter year period. It includes preventive maintenance as well as rectiï¬cation of all types of failures of the system. All the required components/modules pertaining to the system as described below will be supplied by the contractor for maintenance and rectiï¬cation of failures. i) SMPS based FRBC Panel. a) FRBC module- 110...
Contract Type : Works - General
Tender Type : Single
Advertised Value : 3099358.08
Bidding Style : Single Rate for Tender
Bidding System : Single Packet System
Pre-Bid Required : No
Pre-Bid Query Date Time :
Tendering Section : SIGNAL
Bidding Unit : Above/Below/Par
Publishing Date / Time : 15/07/2026 12:25
Period Of Completion : 36 Months
Bidding Start Date : 24/07/2026
Closing Date Time : 07/08/2026 14:00
Validity of Offer ( Days) : 90
Are Joint Venture (JV) firms allowed to bid : No
Tender Doc. Cost (Rs.) : 0.00
Earnest Money (Rs.) : 62000.00
Documents
Tender Notice
viewNitPdf_5358956.pdf
GCC_April-2022.pdf
2022_CE-I_CT_GCC-2022Policy14.07.2022.pdf
ACS-2toGCC-2022_2022-CE-1-CT-GCC-2022-POLICY_13.12.20221.pdf
mergedGCCCorrectionslip3456.pdf
MergedGCCCorrectionSlip78910.pdf
2018-CE-I-CT-9dtd.pdf
Annexure-C.pdf
AllAnnexure.pdf
GCCCorrectionslip11.pdf
CheckList_1.pdf
Modified_Cable_cut_JPO_NO._941.pdf
IPS-AMRA-RAJA_1.pdf