Expired Tender Morocco ICB TOT Ref. 35130351

Contract notice: EIB - Design, construction Tender - 35130351

Tender notice from Morocco, published on 31 Jul 2019.

Executive Summary

The MORROCCAN AGENCY FOR SOLAR ENERGY has issued a Tender notice for the procurement of a Contract notice: EIB - Design, construction, operation, maintenance and financing of a 150-190 MW solar power plant in the Morocco. This Tender notice was published on 31 Jul 2019 and is scheduled to close on 16 Sep 2019, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 35130351, while the tender notice number is 358676-2019 and Register on the platform.

Key facts

Summary
Contract notice: EIB - Design, construction, operation, maintenance and financing of a 150-190 MW solar power plant
TOT Ref. No.
35130351
Document Ref. No.
358676-2019
Country
Morocco
Notice type
Tender
Competition
ICB
Publication date
31 Jul 2019
Bid deadline
16 Sep 2019
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
EIB - Design, construction, operation, maintenance and financing of a 150-190 MW solar power plant
Description: Contract notice: EIB - Design, construction, operation, maintenance and financing of a 150-190 MW solar power plant
Authority Type: Utilities entity
Contact Nature: Works
Procedure: Not specified
Document: Contract notice
Regulation: European Investment Bank, European Investment Fund, European Bank for Reconstruction and Development
Award criteria: Not specified
CPV code: 71356200,
CPV Description: Technical assistance services.
.
The ambitious objective recently set by Morocco to source 52 % of its installed capacity from renewable energy by 2030, positions the kingdom as a front-runner in the fight against climate change. To meet this ambitious target, an integrated, homogenous and centralized implementation of all renewable energy projects, either using solar, wind or hydro power, was assigned to Masen, to work in close collaboration with ONEE..
Noor multi-site and multi-technology solar power plants are expected to produce a minimum capacity of 2, 000 MW by 2020. In parallel with the projects developed in Ouarzazate, Laayoune and Boujdour, Masen is launching the request for qualification process ('RfQ') to develop the second project of the NOOR Midelt solar complex ('Noor Midelt II Project')..
The project consists in a PV (photovoltaic) and/or CSP (concentrated solar power) power plant with a minimum of 5 hours peak production storage. The expected net capacity during peak hours (after sunset) shall be between 150 MW and 190 MW. The maximum net capacity measured at the delivery point during the day (which refers to off-peak hours) may exceed the net capacity measured at the delivery point after sunset (which refers to peak hours) by 20 %. Net capacity shall be measured at delivery point..
This project is open to all PV and BESS (Battery Energy Storage System) technologies complying with Masen's requirements in terms of, track record, performance guarantee and equipment durability to match the PPA duration, as these will be detailed at Request for Proposals ('RfP') stage. During the peak hours, the electricity could be produced either from:.
(i) the BESS;.
(ii) the steam turbine through a TES (Thermal Energy Storage) system; or.
(iii) both..
The Noor Midelt II Project will be developed under an IPP (Independent Power Production) scheme, through an international tender process, conducted in several stages, for the design, financing, construction, operation and maintenance of the related plants..
All interested parties are invited to download the pre-qualification document through the following link: https://masen.local-trust.com, from 9.7.2019..
The deadline for submission to the RfQ is the 16.9.2019 at 10:00 a.m. Moroccan time..
Internet address (URL):

Documents

Tender Notice
Login to view

Similar tenders

Morocco Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: EIB - Design, construction, operation, maintenance and financing of a 150-190 MW solar power plant was 16 Sep 2019. Bidding is closed.

This tender has been issued by MORROCCAN AGENCY FOR SOLAR ENERGY in Morocco.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 71356200 - Technical assistance services.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 35130351. The purchaser document reference is 358676-2019.

See the Similar Tenders section on this page or browse other tenders from Morocco.

This tender falls under Construction and Real Estate in Morocco. Suppliers in these sectors can track similar Morocco tenders using CPV-based alerts.