Contract notice: EBRD - Pre-qualification Tender in Egypt - 37599320
Tender notice from Egypt, published on 31 Oct 2019.
Executive Summary
The GASCO has issued a Tender notice for the procurement of a Contract notice: EBRD - Pre-qualification Documents for EGAS Energy Efficiency Project, Gas Metering Systems in the Egypt. This Tender notice was published on 31 Oct 2019 and is scheduled to close on 19 Nov 2019, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 37599320, while the tender notice number is 514690-2019 and Register on the platform.
Key facts
Summary
Contract notice: EBRD - Pre-qualification Documents for EGAS Energy Efficiency Project, Gas Metering Systems
Object of the contract EBRD - Pre-qualification Documents for EGAS Energy Efficiency Project, Gas Metering Systems Description: Contract notice: EBRD - Pre-qualification Documents for EGAS Energy Efficiency Project, Gas Metering Systems Authority Type: Utilities entity Contact Nature: Supplies Procedure: Open procedure Document: Contract notice Regulation: European Investment Bank, European Investment Fund, European Bank for Reconstruction and Development Award criteria: Not specified CPV code: 38410000, 45333200, CPV Description: Metering instruments. Gas meter installation work. Procurement reference: 9531-PRE-48901. Project name: EGAS Energy Efficiency Project. Country: Egypt. Business sector: Natural resources. Project ID: 48901. Funding source: EBRD loan proceeds. Type of contract: Project goods, works and services. Type of notice: Invitation for pre-qualification. Issue date: 22.10.2019. Closing date: 19.11.2019, by 11.00 a.m. Egypt time. This invitation for pre-qualification follows the general procurement notice for this project, which was published, on the EBRD website, project procurement notices. (https://www.ebrd.com/work-with-us/procurement/p-pn-181107a.html) on 7.11.2018.. GASCO, hereinafter referred to as 'the Client', intends, using part of the proceeds of a Loan from European Bank for reconstruction and development, hereinafter referred to. As 'the Bank' towards the cost of EGAS Energy Efficiency project, to improve its gas metering systems.. The overall gas metering systems project is summarised in the below, for each lot.. Lot A. Upgrade gas metering stations by adding online gas chromatographs (GCs) to their measurement systems so that they can perform gas measurement based on energybasis. This is considered one of the most important requirements of the Egyptian Gas Regulatory Authority.. Increase the gas measurement accuracy for a number of gas stations by changing their primary measuring element from orifice to ultrasonic (USM) and also by adding on line. GCs as well as their auxiliaries, to achieve the goal of energy measurement.. Lot B. Upgrade gas metering stations by replacing the obsolete gas measurement devices (particularly the flow computers) with new ones with their auxiliaries, to maintain healthier, more accurate and reliable measurement systems.. Lot C. Upgrade gas metering stations by changing the old/damaged turbine meters (TM) or adding new ones. This lot covers variable TM sizes having different ANSI ratings (150/300/600), either serving consumers' stations or Gasco distribution centres.. Variable TM sizes having different ANSI ratings subject to existing stations conditions are covered. Each one of the TMs supplied under this lot is required to be equipped with a volume corrector (locally-mounted) on it.. Lot D. Upgrade gas metering stations by replacing the old/damaged uninterruptible power supply systems (UPS) with new ones to secure the DC supply to all important devices and instruments inside existing control room shelters, especially those responsible for performing gas measurement such as flow computers and GCs.. Lot E. Supply and installation of RTU's. Supply and installation of Remote Terminal Units (RTUs) purpose is to collect all operational data in site (e.g. pressure, temperature, valve status and command for valve, shelter door status, rectifier status, etc.) to be connected to Gasco Scada control centres for monitoring and controlling the communication media in site for the connectivity between site and control centres.. Lot F. Supply and installation of interface equipment. The purpose is to collect all operational data in site (e.g. pressure, temperature, valve status and command for valve, shelter door status, rectifier status .... etc.) from the interface of Gasco metering system, then connect the data to Gasco Scada control centres for monitoring and controlling the communication media in site for the connectivity between site and control centres.. Lot G. Al-Waleedia pressure reduction and metering gas station. The scope of work of this station will include supplying and commissioning of the skid-mounted filtering, reducing, heating and metering gas station to serve feeding natural gas to Al- Waleedia power plant at Assiut governorate in Upper Egypt as an alternative fuel instead of the heavy oil fuel (current fuel of the power plant) which is currently causing harmful and dangerous emissions to environment and all the living creatures. Applicants, solely or through JV, to quote for the following scope of the contract:. Lot D: Supply and commissioning of Qty (17) UPS systems upgrade gas metering stations by replacing the old/damaged uninterruptible power supply systems (UPS) with new ones to secure the DC supply to all important devices and instruments inside existing control room shelters, especially those responsible for performing gas measurement such as flow computers and GCs.. Pre-qualification and tendering for contracts to be financed with the proceeds of a Loan from the Bank is open to firms and joint ventures of firms from any country.. Pre-qualification documents may be obtained from the office at the address below or in electronic format free of charge.. Kindly note that invitations for four (4) 'Pre-qualification Documents for EGAS energy efficiency project, gas metering systems' lots are published simultaneously (Lot A, Lot B, Lot C, Lot D, ). Hence, applicants are free to apply to qualify for more than one lot if appropriate, which would mean that accumulated amounts and requirements as per pre-qualification data sheet (PDS), clause 22 need to be observed.. The procurement process for the Lot E, Lot F and Lot G is planned to be carried out through open tendering without pre-qualification.. The pre-qualification documents must be duly completed and delivered to the address below, on or before 19.11.2019, by 11.00 a.m. Egypt time.. Documents which are received late may be rejected and returned unopened.. Interested firms may obtain further information from, and inspect and acquire the prequalification documents at the following office:. . Internet address (URL):
The bid deadline for Contract notice: EBRD - Pre-qualification Documents for EGAS Energy Efficiency Project, Gas Metering Systems was 19 Nov 2019. Bidding is closed.
This tender has been issued by GASCO in Egypt.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 38410000 - Metering instruments, 45333200 - Gas meter installation work.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 37599320. The purchaser document reference is 514690-2019.
This tender falls under Technology and Equipment, Construction and Real Estate in Egypt. Suppliers in these sectors can track similar Egypt tenders using CPV-based alerts.