Expired Tender Egypt ICB TOT Ref. 34045418

Contract notice: EBRD - Pre-qualification Tender in Egypt - 34045418

Tender notice from Egypt, published on 21 Jun 2019.

Executive Summary

The ENPPI has issued a Tender notice for the procurement of a Contract notice: EBRD - Pre-qualification Documents for EGAS Energy Efficiency Project in Dahshour Compression Station Lot 4 Balance of Plant Instrumentation and Control, Including O&M Training an... in the Egypt. This Tender notice was published on 21 Jun 2019 and is scheduled to close on 14 Jul 2019, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 34045418, while the tender notice number is 288645-2019 and Register on the platform.

Key facts

Summary
Contract notice: EBRD - Pre-qualification Documents for EGAS Energy Efficiency Project in Dahshour Compression Station Lot 4 Balance of Plant Instrumentation and Control, Including O&M Training an...
TOT Ref. No.
34045418
Document Ref. No.
288645-2019
Country
Egypt
Notice type
Tender
Competition
ICB
Publication date
21 Jun 2019
Bid deadline
14 Jul 2019
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
EBRD - Pre-qualification Documents for EGAS Energy Efficiency Project in Dahshour Compression Station - Lot 4 - Balance of Plant Instrumentation and Control, Including O&M Training and Spare Parts
Description: Contract notice: EBRD - Pre-qualification Documents for EGAS Energy Efficiency Project in Dahshour Compression Station Lot 4 Balance of Plant Instrumentation and Control, Including O&M Training and Spare Parts
Authority Type: Utilities entity
Contact Nature: Supplies
Procedure: Open procedure
Document: Contract notice
Regulation: European Investment Bank, European Investment Fund, European Bank for Reconstruction and Development
Award criteria: Not specified
CPV code: 45333200, 71356200, 90500000,
CPV Description: Gas meter installation work.
Technical assistance services.
Refuse and waste related services.
Procurement referece: 9443-PRE-48901.
Project name: EGAS Energy Efficiency project.
Country: Egypt.
Business sector: Natural resources.
Project ID: 48901.
Funding source: EBRD loan proceeds.
Type of contract: Project goods, works and services.
Type of notice: Invitation for Pre-qualification.
Issue date: 17.6.2019.
Closing date: 14.7.2019 by 10:00 a.m. Egypt time.
This invitation for Pre-qualification follows the general procurement notice for this project, which was published, on the EBRD website, project procurement notices (https://www.ebrd.com/work-with-us/procurement/p-pn-181107a.html) on 7.11.2018..
GASCO, hereinafter referred to as 'the Client', intends, using part of the proceeds of a Loan from European Bank for Reconstruction and Development, hereinafter referred to as 'the Bank' towards the cost of EGAS energy efficiency project, to extend capacity of existing Dahshour compression station by 652 MMSCFD..
Dahshour existing compression station, commissioned in 2012, is composed of 4 turbo compressor packages (3 in operation and 1 stand-by), designed to receive 979 MMSCFD of gas from the national gas network at a pressure and temperature ranging respectively from 25.3 to 50 bara and 15 to 33C, in order to pressurize the gas up to 71 bara, to be directed into the Assuit/Aswan pipeline via the existing Dahshour/El Koraimat 36" P/L. Each existing compression train is consisting of one single-stage compressor driven by gas turbine, suction drum and after cooler. The gas outlet temperature from compression train is about 55C..
Compression station extension shall be achieved by one of the following scenarios:.
1) Adding 1 new turbo-compressor Train 5 sized to receive a feed of 326 MMSCFD @ 25, 2 bara and 33C @ battery limit, in addition to 2 electrical motor driven compressor trains (Train 6 A/B) each sized to receive a feed of 163 MMSCFD @ 25, 2 bara and 33oC @ battery limit;.
2) Adding 1 new turbo-compressor Train 5 sized to receive a feed of (326 - X) MMSCFD @ 25, 2 bara and 33C @ battery limit, in addition to 2 electrical motor driven compressor trains (Train 6 A/B) each sized to receive a feed of (163 + X/2) MMSCFD @ 25.2 bara and 33oC @ battery limit;.
3) Adding 2 new turbo-compressor Train 5 A/B each sized to receive a feed of 163 MMSCFD @ 25, 2 bara and 33C @ battery limit, in addition to 2 electrical driven compressor trains (Train 6 A/B) each sized to receive a feed of 163 MMSCFD @ 25, 2 bara and 33oC @ battery limit.
An ORC system shall be sized, designed and supplied to recover the waste heat energy from existing and new gas turbines, by exchanging heat in the stack between the exhaust and thermal oil through a 'Hot Thermal Oil Circulation System', and then this heat is transferred to an ORC package. Organic Rankine Cycle (ORC) utilizes the heat energy in the GTG exhaust to heat an organic fluid to a superheated vapor state in an evaporator. The organic fluid then expands in 2x50% ORC turbines connected to 2 generators delivering electric power. The organic fluid then condenses in an air-cooled condenser, and then is pumped again to the evaporator to complete the cycle. Recuperators, economizers, regenerators, etc. shall be installed in the ORC system, as deemed necessary by ORC supplier, to enhance the heat recovery effort..
Applicants, solely or through JV, to quote for the following scope of the contract:.
Engineering, design, manufacture, fabrication, test and supply of:.
1) Fire and gas detection and alarm system, including but not limited to the following:.
— SIL-2 fire and gas detection and alarm system, ControlLogix controller, .
— upgrade the existing SIL-2 fire and gas detection and alarm system, controlLogix controllers with the latest firmware and interface requirements with the new fire and gas system.
— MIMC/MATRIX switches F&G panel.
— UL listed and FM approved Fire and gas detectors and alarm devices for hazardous area installation (triple-IR flame detector, IR-gas detectors, Manual alarm call points, Horn/beacon combined units, pneumatic Fusible plugs loops, linear heat detectors ...etc.)..
— new power supply panel (batteries and battery charger) to provide the required power requirements for the SIL-2 Fire and gas detection system and its field devices as per NFPA-72 requirements..
— New Human Machine interface (HMI) operator workstation, .
— fire resistant and flame retardant fire and gas cables, single and multi-pair stranded copper cables, galvanized steel wire armour. as per IEC requirements, .
— cable glands, metric stainless steel glands for zone-2 gas group IIA hazardous area classification installation, .
— stainless steel junction boxes for zone-2 gas group IIA hazardous area classification installation, .
— stainless steel, perforated type cable tray and its accessories (covers, splice plates, vertical and horizontal elbows and Tee, etc.) as per NEMA requirements, .
— galvanized carbon steel conduits and its fittings as per NEMA requirements..
2) Firefighting and safety equipment, including but not limited to the following:.
— UL listed and FM approved deluge valves, pre-assembled on skid, .
— UL listed and FM approved self-oscillating monitors with automatic 24VDC electrically actuated on/off valve with all accessories..
(nozzle, valves, flanges, etc.)..
— UL listed and FM approved fire water curtain with automatic 24VDC electrically actuated on/off valve with all accessories (nozzle, valves, flanges, etc.), .
— UL listed and FM approved wet Type fire hydrant with all accessories (isolation and pressure control valves, flanges, etc.), .
— UL listed and FM approved portable fire extinguishers (dry powder and CO2), .
— UL listed and FM approved wheeled dry powder fire extinguisher, .
— UL listed and FM approved hose reels..
3) Field Instruments and bulks (in case of upgrading or addition any of the utility systems):.
3.a) Field instruments:.
— instruments shall be compatible with the plant process control/safety system all field instrumentation shall be electronic or direct reading (local level/pressure/flow/temperature indicators, switches, electric stations, among others)..
Electronic instrumentation shall be intelligent (microprocessor based)..
— for process control and monitoring applications, the electronic transmitters shall be 2 — wire, 24 Vdc loop powered, 4-20 mA HART protocol or FF Protocol, .
—for SIS applications, the electronic transmitters shall be 2 — wire, 24 Vdc loop powered. 4-20 mA Hart protocol, and shall have TUV or factory mutual approvals for safety applications, SIL 2 as a minimum according to IEC 61508, unless otherwise specified. All construction materials shall be compatible with the service and environmental conditions..
— instruments wetted parts shall be compatible with the process fluid and shall be specified 316 stainless steel as a minimum, .
— the transmitters shall have transient surge protection whenever specified..
3.b) ESD and control valves:.
— ESD on/off ball valves of size 2" and above shall have trunnion mounted ball, .
— ball valves shall be bidirectional flow capability without degrading shutoff function, .
— valve body shall be side entry unless top entry valve is specified in the detailed specification, .
— all soft seat and seal materials shall be suitable for the service, minimum/maximum design temperature and pressure as stated in the individual detailed specification, .
— all on/off ESD and blow down valves shall be certified fire — safe type and shall be tight shutoff, .
— valves design and face to face dimensions shall be in accordance with requirements of API 6D, .
— all flanges shall be integrally cast or forged with the valve body, i.e., slip — on flanges are not permitted, .
— the pneumatic actuator type shall be single acting spring return piston. Double acting piston shall be approved by the customer, .
— the control valve body material shall be carbon steel, as minimum. When carbon steel is not suitable, the material specification of the line shall prevail, .
— the control valve Trim Material shall be 316 stainless steel as minimum, .
— all control valves bodies shall be flanged, and shall be sized in accordance withISA S75, .
— the minimum flange rating of the control valve shall be ASME 300# RF..
Threaded valves shall not be used..
— reduced ports can be used in accordance with the requirements of the process, .
— the noise generated through the control valve shall not exceed 85 dBA at one meter..
3.c) Electrical and mechanical bulk:.
— instrument junction boxes shall be increased safety EExe certified, 316 stainless steel, IP 65, .
— instrument cables shall employ class 2, 5 according to IEC 60228, braiding, stranded, 7 strands, copper conductors, flame retardant, low emission of toxic, moisture and water resistance, vapor and gas tight in compliance with IEC-60332, .
— cable glands to be brass nickel plated material and certified Eexd IIB T3, IP 65, complete with PVC shroud, .
— all bulks such as valves, tubing and fittings shall be 316 SS minimum..
Pre-qualification and tendering for contracts to be financed with the proceeds of a loan from the bank is open to firms and joint ventures of firms from any country..
Pre-qualification documents may be obtained from the office at the address below or in electronic format free of charge..
Kindly note that invitations for the three (3) 'Pre-qualification Documents for EGAS Energy Efficiency Project in Dahshour Compression Station' lots are published simultaneously. Hence, Applicants are free to apply to qualify for more than one lot if appropriate, which would mean that accumulated amounts and requirements as per Pre-qualification Data Sheet (PDS), clause 22.1 need to be observed..
The pre-qualification documents must be duly completed and delivered to the address below, on or before 14.7.2019, by 10:00 a.m. Egypt time. Documents which are received late may be rejected and returned unopened..
Interested firms may obtain further information from, and inspect and acquire the pre-qualification documents at the following office:.
Contact person: .
Internet address (URL):

Documents

Tender Notice
Login to view

Similar tenders

Egypt Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: EBRD - Pre-qualification Documents for EGAS Energy Efficiency Project in Dahshour Compression Station Lot 4 Balance of Plant Instrumentation and Control, Including O&M Training an... was 14 Jul 2019. Bidding is closed.

This tender has been issued by ENPPI in Egypt.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 45333200 - Gas meter installation work, 71356200 - Technical assistance services, 90500000 - Refuse and waste related services.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 34045418. The purchaser document reference is 288645-2019.

See the Similar Tenders section on this page or browse other tenders from Egypt.

This tender falls under Construction and Real Estate in Egypt. Suppliers in these sectors can track similar Egypt tenders using CPV-based alerts.