Tender notice from Burkina Faso, published on 12 Feb 2018.
Executive Summary
The NATIONAL ELECTRICITY COMPANY OF BURKINA (SONABEL) has issued a Tender notice for the procurement of a Tenders are invited for Kossodo Power Plant Strengthening Project. in the Burkina Faso. This Tender notice was published on 12 Feb 2018 and is scheduled to close on 04 Apr 2018, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 20536790, while the tender notice number is 003/2018/DMP and Register on the platform.
Key facts
Summary
Tenders are invited for Kossodo Power Plant Strengthening Project.
Tenders are invited for Kossodo Power Plant Strengthening Project. Engineering, Supply of Materials and Equipment, Civil Engineering, Assembly, Testing and Commissioning of a 50 MW Power Plant Consisting of Diesel Generating Units Operating at HFO (Three or More) with Combined Cycle Option with a 3 to 5 MW Steam Turbine. Short description of works:
Power plant
Engineering, supply of materials and equipment, civil engineering, assembly, testing and commissioning of a 50 MW power plant consisting of diesel generating units operating at HFO (three or more) with combined cycle option with a 3 to 5 MW steam turbine.
Evacuation system
Engineering, supply of materials and equipment, civil engineering, assembly, testing and commissioning of the grid connection system consisting mainly of a 15 kV substation, two (2) 90 kV bays and two (2) transformers 90 / 15 kV of power 70 MVA each.
Operation and Maintenance Operations and Maintenance
Support Services for the first three years (O & M)
1.This tender notice follows the general procurement notice for the project published in the Burkina Faso Public Markets Review N ° 2099 of July 19, 2017, in the Daily Burkinabe Sidwaya N ° 8434 of June 28, 2017 and in the weekly Jeune Afrique N ° 2945 from June 18 to 24, 2017.
2. Burkina Faso has received funding from the Islamic Development Bank (IDB) to cover the cost of the Kossodo Power Plant Strengthening Project (PRCK), and intends to use part of the proceeds from this project. financing this contract. The disbursement of funds by the IDB will be subject in all respects to the terms and conditions of the financing agreement including the guidelines for procurement financed by the IDB. If the IDB does not agree otherwise, no party other than Burkina Faso may avail itself of the financing contract or have a claim against it.
The National Electricity Company of Burkina (SONABEL), project executing agency intends to select companies for the realization of this work.
3.The selection will be conducted in accordance with the procedures specified in the Guidelines of the Islamic Development Bank for Procurement of Goods and Works of May 2009, revised in February 2012; it is open to all applicants from countries that meet the criteria of source, as defined in these guidelines.
4. Eligible interested candidates may obtain further information and consult the tender document with the National Electricity Company of Burkina (SONABEL) (address below) of 8 hours 30 minutes. at 12 hours and 13 hours 30 minutes at 16:00 local time (UTC).
Interested candidates may purchase a complete set of the tender documents in French at the fixed and non-refundable price of Two hundred and fifty thousand (250, 000) CFA Francs, (i) in cash or by certified check from the Caisse du Head office on the 1st floor at the address indicated below, or (ii) by bank transfer to the account N ° BF0740100100000130020196 open to SOCIETE GENERALE BURKINA FASO on behalf of SOCIETE NATIONALE D'ELECTRICITE DU BURKINA.
The hard copy tender package may be removed at the address specified below upon presentation of proof of payment. Applicants who wish to do so may obtain the electronic version of the file by making a written request to the address indicated below.
The acceptance of any application file will be subject to the purchase of the file; Also, a copy of the purchase receipt will be attached to the offer.
5.The tenders, submitted in one original and four (4) copies in accordance with the instructions to tenderers, and accompanied by a tender guarantee of one billion (1 000 000 000) CFA Francs, must be submitted under envelope sealed at the address below no later than April 04, 2018 at 08:30 min local time (UTC) and must be clearly marked "Call for tenders for the completion of work to strengthen the Kossodo power station".
6.The candidates will remain committed by their offers for a period of one hundred and twenty (120) days, as from the date of submission of the offers.
The bid deadline for Tenders are invited for Kossodo Power Plant Strengthening Project. was 04 Apr 2018. Bidding is closed.
This tender has been issued by NATIONAL ELECTRICITY COMPANY OF BURKINA (SONABEL) in Burkina Faso.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is financed by Islamic Development Bank (ISDB).
The tender is classified under the following CPV code(s): 45232220 - Substation construction work, 45251100 - Construction work for power plant, 45317200 - Electrical installation work of transformers.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 20536790. The purchaser document reference is 003/2018/DMP.
This tender falls under Construction and Real Estate in Burkina Faso. Suppliers in these sectors can track similar Burkina Faso tenders using CPV-based alerts.