Tenders are invited for Drilling Rehabilitation Works.
Reference: Drinking Water Supply and Sanitation Measures Program in Semi-Urban and Rural Centers (PAEPMA) 1. The National Directorate of Hydraulics - Ministry of Energy and Water of the Republic of Mali obtained funding from the Federal Republic of Germany through the German Financial Cooperation (KfW Development Bank) to finance the cost of the Drinking Water Supply and Sanitation Program in semi-urban and rural centers (PAEPMA ). It is anticipated that a portion of the funding provided under this funding will be used to make expected payments for 74 new boreholes and the rehabilitation of 16 existing boreholes in the Mopti region. For the realization, these works are divided into three sections. The basic contract (first tranche) concerns localities in the circles of Djenne, Mopti, Bandiagara, Tenenkou and Douentza. The second phase concerns localities in the Koro district and the third phase concerns localities in the Bankass district. Achievements will be made in successive installments, a new installment will be able to start only when 80% of the work of the previous tranche will be received 2. The National Directorate of Hydraulics - Ministry of Energy and Water of the Republic of Mali solicits Closed Bids from Eligible Bidders to Execute the Rehabilitation of 16 operational boreholes and the completion of 74 new boreholes in the Mopti region. 3. Eligible and interested Bidders can obtain information from the National Directorate of Hydraulics at the level of the Program Manager
[email protected] and take note of tender documents at the National Directorate of Hydraulics, Patrice Lumumba Square, BP 66 Bamako - Mali Monday to Friday from 8 am to 4 pm. 4. Interested Bidders may obtain the complete Bidding Documents in French by making a written request to the above address for a non-refundable payment of 150, 000 CFA F (one hundred and fifty thousand FF) 229 € ( two hundred and twenty-nine euros). 5. The Instructions to Bidders and the Conditions of Business and General Conditions are those of the Type of Procurement Documents for Works of the French Development Agency. 6. Bids must be submitted to the above address no later than 9:00 am on April 9, 2018. Tenders must include a Bid Security for an amount of nine million CFA (9, 000, 000 XOF). or the equivalent amount in a freely convertible currency . 7. Bids will be opened in the presence of Bidders' representatives who wish to the National Directorate of Water, Square Patrice Lumumba, BP 66 BAMAKO - Mali, April 9, 2018 at 10 am 00. 8. requirements Qualifications are: ? Financial capacity: i. The Bidder must have access to liquid assets, unencumbered assets or lines of credit, etc. (other than the possible start-up loan), up to two hundred thousand euros (€ 200, 000); ii. the Bidder must have the financial means to meet the cash requirements of the works in progress and future in the framework of contracts already committed, up to one hundred and fifty thousand euros (€ 150, 000) per contract; iii. over the last 3 years (2015 to 2017) the tenderer must have an average turnover equivalent to one million five hundred thousand euros (1 500 000 EUR); and a liquidity ratio 1.1 and a debt ratio 80%. ? technical capacity: i. the bidder must have two (mud air) drill workshops with sufficient capacity to drill up to 300 m depth with its accompaniment trucks, connecting vehicles, gaskets and all necessary accessories as well as two servicing with compressor generator, pumps, dewatering column and air-lift with all these accessories (level probe, conductivity meter ph meter flow measurement system suitable for high flow rates ...). ii. experience in drilling contracts as a principal contractor, group member or general contractor within the last three (3) years. iii. over the last three years, the bidder must have completed three projects to achieve at least fifty (50) boreholes for a minimum amount equivalent to six hundred thousand euros (600, 000 eur). iv. for the markets referenced above or for other contracts executed as a prime contractor, group member or main contractor during the period stipulated in paragraph 4.2 (a) above, a minimum experience of five construction contracts completed satisfactory in the following areas: borehole rehabilitation drilling aep network construction.
[disclaimer: the above text is machine translated. for accurate information kindly refer the original document.]