Procurement Summary
Country : South Africa
Summary : Supply, Delivery, Installation, and Commissioning of Modular 60 Kva 3-Phase Uninterruptable Power Supply
Deadline : 12 Apr 2024
Other Information
Notice Type : Tender
TOT Ref.No.: 99368062
Document Ref. No. : ATNS/RFQ0027/ATAOR/2023/2024
Competition : ICB
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Purchaser : AIR TRAFFIC AND NAVIGATION SERVICES SOC LTD REPUBLIC OF SOUTH AFRICA
Eastgate Office Park Block C South Boulevard Road Bruma 2198 Gauteng, Private Bag X15 Kempton Park
1620
Attn: Simphiwe Qwabe
Tel: +27-860286726
Fax: +27-116071570
South Africa
Email :RFQs@atns.co.za/Lamentn@atns.co.za
Tender Details
Quotation are invited for Appointment of a Service Provider for Supply, Delivery, Installation, and Commissioning of Modular 60 Kva 3-Phase Uninterruptable Power Supply for the Atns Aviation Training Academy (Ata)
Overview
Size: 60 kVA, modular and scalable (Hot-Swappable)
Run-time: 1, 5 hours
Delivery Lead times: 2 Week from the Issuing of purchase order
To be included with the delivery: CD with Software
Dust Filters (if applicable)
Installation guide
Network Management Card (if applicable)
1-year maintenance and warranty services
Product datasheet
3. Specification
The UPS to be provided shall comply to the following minimum requirements. A product
datasheet to be provided to deem the product compliant.
4. General
UPS Topology: True online double conversion
Architecture: Modular, Scalable, redundant based, hot swappable
In/Out Phase Configuration: 3/3
Bypass type: static / electromagnetic
1
Modular UPS Unit up to a minimum
60 kVA Sum 1
2 Maintenance bypass panel Sum 1
3
UPS enclosure/Cabinet to
accommodate 100 kVA or more Sum 1
4 UPS control module Sum 1
5 Disposal if existing UPS Sum 1
Batteries and Runtime
6 Lithium Ion, for 90 minutes runtime Sum 1
7 Battery Stand/Cabinet Sum 1
8 Battery Breaker incl box Sum 1
9
Disposal of existing battery and
cabinet Sum 1
Communication
10
Remote Control and Monitoring with
SNMP card, GSM interface card,
emergency power off Num 1
Provisional items
11
5m cabling from the incoming feed to
the UPS m 10
12 15m cabling the UPS to DB1 m 10
13 15m Cabling from UPS to DB2 m 10
14
Connection and termination into the 3
distribution boxes Sum 3
15
Supply and installation of isolators
(3X) for the distribution boxes Sum 3
16 Labour Sum 1
17 Deliveries Sum 1
18 As-Builts Sum 1
19 Certificate of Compliance Sum 1
20 Disposal Cerificate Issue Sum 1
21 1-year warranty Sum 1
Documents
Tender Notice