ELECTRICITY DEVELOPMENT CORPORATION (EDC) has floated a tender for Supply and Installation of Meteorological and Hydrological Equipment in 27 Stations in the Sanaga Watershed. The project location is Cameroon and the tender is closing on 27 Feb 2019. The tender notice number is 002/AOIO/EDC/CIPM/2018, while the TOT Ref Number is 29382695. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Cameroon

Summary : Supply and Installation of Meteorological and Hydrological Equipment in 27 Stations in the Sanaga Watershed

Deadline : 27 Feb 2019

Other Information

Notice Type : Tender

TOT Ref.No.: 29382695

Document Ref. No. : 002/AOIO/EDC/CIPM/2018

Competition : ICB

Financier : Agence Francaise De Development (AFD)

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : ELECTRICITY DEVELOPMENT CORPORATION (EDC)
Attn: Salihou Bapetel Spécialiste Passation des Marchés Passation des Marchés Immeuble Hibiscus, Rue des Banques BP 15111 Yaoundé Yaoundé Tel: +237222206220
Cameroon
URL :http://www.edc-cameroon.org

Tender Details

Tenders are invited for Supply and Installation of Meteorological and Hydrological Equipment in 27 Stations in the Sanaga Watershed in Cameroon.

1. The Government of the Republic of Cameroon has received a loan from the French Development Agency to finance the construction project of the hydro-electric dam of Lom Pangar. For this purpose, Electricity Development Corporation (EDC) intends to use a portion of the funds from this appropriation to make eligible payments under Contract No. 002 / AOIO / EDC / CIPM / 2018 for the supply and sale of electricity. installation of meteorological and hydrological equipment in the Sanaga watershed
2. The Project Owner, Electricity Development Corporation (EDC) is soliciting bids from eligible bidders to perform the services in the localities described in 11:
3. The maximum period of execution of benefits is twelve (12) months.
4. The period of validity of tenders shall be one hundred and twenty (120) days from the date of opening of tenders
5. The tendering procedure shall be conducted in accordance with the international tender procedures specified in Procurement Guidelines financed by AFD; it is open to all bidders from countries that meet the eligibility criteria as defined in the Guidelines.
6. Eligible and interested Bidders may obtain information and clarifications from the Contracting Authority during business hours (07:30 to 15:30) at the following address: Electricity Development Corporation located at the Hibiscus building, opposite Lycée Fustel de Coulanges, mail service, 4th floor, door 412; Tel / fax: fax: 22 23 19 30/22 23 11 13; PO Box 15111 Yaoundé.
7. Interested bidders may obtain the complete Tender Documents at the address mentioned above against presentation of the original of the payment receipt with the BICEC Agency, account n ° 335 988 opened in the name of the ARMP of the non-refundable amount of one hundred thousand (100, 000) CFA francs, representing the cost of purchasing the file. When withdrawing the Dossier, tenderers will have to register by leaving their complete addresses: Mailbox, Telephone, Fax, Telex, E-mail.
8. Tenders must be submitted to the above address no later than 12 noon on February 27, 2019. The electronic submission procedure will not be permitted. Any tender received late will be rejected. The bids will be opened on February 27, 2019 at 1:00 pm by EDC's Internal Tenders Board (CIPM) in the presence of bidders or their duly authorized representatives who wish to be present
9. Bids must include a bid security for an amount of ten million (10, 000, 000) CFA francs.
10. Qualification requirements are:
• eligibility;
• History of non-performance of contracts;
• Financial situation and performance;
• Experience;
11. Localities affected by the services

N ° Site // Lat (°) // Long East (°) // Access (localities / distances) // Nature of the road
1 Mboukou // 5.748000 //13.606444 // Bertoua - Bétaré Oya (176 km) Asphalt road (RN1) // Betaré Oya - Mboukou station (?92 km) // Earth road
2 Goyoum //5.201250 // 5.201250 // Bertoua - Bélabo (?80 km) Asphalt road // Bélabo - Goyoum station (? 40 km) // Earth road
3 Taparé // 6.058083 //14.388056 // Bertoua - Garoua Boulaï (?250 km) Bitumen road (RN1) // Garoua Boulaï - Taparé station (? 30 km) // Land road
4 Mali // 5.662000 //14.142083 // Bertoua - Bétaré Oya (?180 km) Asphalt road (RN1 / RD) //
Bétaré Oya - Mali station (? 15 km) // Earth road
5 Aval dam // 5.389750 //13.497889 // Bertoua - Bélabo (?80 km) Asphalt road (RN1 / RN18) // Bélabo - H Lom pangar station (?90 km) // Earth road
6 Mbitom // 5.698333 / /13.333778 // Bertoua - Bélabo (?80 km) Paved road // Bélabo station - Mbitom station (? 110 km) // Railway
7 Mabélé // 6.021917 //13.940111 // Bertoua - Bétaré Oya (?180 km) // Paved road (RN1) //
Betaré Oya - Mabélé station (? 100 km) // Earth road
8 Fell //6.511202 //14.627935 // Bertoua - Ndokayo (?170 km) // Paved road (RN1 ) // Ndokayo - Ngazi (?195 km) // Asphalt road (RN1) // Ngazi - Fell station (?95 km) // Earth road (D22)
9 Djeke // 4.790221 //11.997500 // Yaoundé - Ndjolé (?160 km) // Tarmac road / dirt road (RN1 / RN15) // Njolé - Djeke station (? 6 km) // dirt road (D22)
10 Nanga Eboko //4.719222 //12.371889 // Yaoundé - Nanga Eboko (?180 km) // Asphalt road (?170 km) (RN1) // dirt road
11 Mandjouk //4.966600 //12.916667 // Yaoundé - Station from Mandjouk (?340 km) // Asphalt road / dirt road (RN1)
12 Mekie Djerem input // 5.321831 //13.402963 // Bertoua - Bélabo (?80 km) // Asphalt road (RN1 / RN18) // Bélabo - Goyoum station (? 40 km) // Earth road //
Goyoum - Mekie Djerem station (?10 km) // Earth road
13 Djoa Meng intake // 6.573547 //12.452457 // Yaoundé - Tibati (? 460 km) // Asphalt road (RN15) // Tibati - Djoa (? 17km) // Asphalt road (RN15 / RN6) // Djoa - Station Djoa Meng intake (? 6 km) // Earth road
14 Maouor input // 6.582357 //12.647718 // Yaoundé - Tibati (? 460 km) // Asphalt road / dirt road (RN15) //
Tibati - Maouor supply station (? 16km) //
Asphalt road (RN15 / RN6) 15 Mboula //6.700151 //13.977496 // Yaoundé - Meiganga - Gangi (? 700 km) // Bitumen road (RN1 / RN10) // Gangi - Mboula station (? 26 km) // Earth road
16 Mbakaou Lom Pangar reservoir exit // 6.303333 //12.807583 // Yaoundé - Tibati (? 460 km) // Paved road / Earth road (RN15) // Tibati - Mbakaou station (? 36km) // dirt road
17 Upstream Meng // 7.197974 //12.517724 // Yaoundé -Tibati - Gazinguet (?576 km) // Asphalt road / dirt road (RN15 / P12)
// Gazinguet - Upstream station Meng (4, 83km) // Route en earth
18 Sangbe Mekie Djerem // // 6.050985 //12.472195 Yaounde - yoko - Doumé - Sangbe Mekie Djerem Station (?390 km) // Road asphalt / dirt road (RN15)
19 Contribution Kim //5.75244 11.500229 // // Yaounde - Ngambe Tikar (?280 km) // Bitumen road / dirt road (RN4 / D94) // Yaoundé - Kim intake station (275 km) before Ngambe Tikar
20 Kimi Mbam upstream supply // 6.036815 //11.497025 Yaoundé - Kimi (?347 km) // Paved Road / Earth Road (RN4)
// Kimi - Kimi Station (?6 km) // Earth Road
21 Provision Ndjim //4.810459 //11.498223 // Yaoundé - Ngoro (?165km) Asphalt road / dirt road (RN4 / D50) //
Ngoro - Ndjim supply station (?25km) // Earth road
22 Nanki //5.88144 //11.117415 // Yaoundé - Manki (?290 km) // Bitumen road / dirt road (RN4 / P25) //
Manki - Nanki station (?5 km) // dirt road
23 Mbam downstream //5.118106 // 11.110065 // Yaoundé - Dioma (?155 km) // Asphalt road / dirt road (RN1 / RN4 / P25) //
Dioma - Mbam downstream station (?25 km) // Earth road
24 Bamendjin downhill //5.683333 / /10.5 // Yaoundé - Bamendjin (?355) // Asphalt road / Earth road (RN4)
// Bamendjin - Bamendjing downstream station (?5 km) // Earth road
25 Noun Bangangté // 5.237843 //10.636074 // Yaoundé - Bangangté (?250 km) // Asphalt road (RN4)
// Bangangté - Bangangté Noun station (?20 km) // Paved road / Earth road (P15)
26 Lahore //7.209289 //13.585748 // Yaoundé - Wakwa (?825 km) // Asphalt road (RN10 / RN1) //
Wakwa - Lahore station (?7 km via N1) Asphalt road (RN1)
27 Bagodo Pangar //6.418193 //13.386197 // Yaoundé - Bagodo (?570km) // Asphalt road (RN15)