Tenders are invited for Supply and Installation of High-Efficiency Electric Pumps and Motors.
1. ONEA has obtained funding from the French Development Agency (AFD) to finance the cost of ONEA`s Priority Drinking Water Action Program in Bobo and Ouagadougou. It is anticipated that a portion of the funding for this funding will be used to make the anticipated market payments for the supply and installation of electropumps and high efficiency engines at ONEA sites at Ouagadougou.
2. ONEA is soliciting closed bids from eligible bidders for the supply and installation of high-efficiency electric pumps and engines at water storage and pumping sites in Ouagadougou.
3. Eligible and interested bidders can obtain information from the National Office of Water and Sanitation (ONEA) / Ouagadougou Drinking Water Supply Project Directorate:
ONEA Headquarters - 220, Avenue de l `ONEA, - Sector 12 (Pissy)
01 BP 170 Ouagadougou 01,
Phone: (226) 25 43 19 00 to 09
Fax: (226) 25 43 19 11
Email:
[email protected] BURKINA FASO,
every working day of 7:30 am to 12:30 pm and from 1 pm to 4 pm.
4. Interested tenderers may consult and / or purchase the complete tender dossier in French, at the ONEA Financial Department, on payment of a non-refundable sum of CFAF 100 000 + shipping costs.
5. The Instructions to Bidders (IS) and the General Conditions of Contract (GCC) are those of the Bidding Documents for Supply of the French Development Agency.
6. A compulsory site visit followed by a preparatory meeting will be organized on 20/07/2017 from 8.00. The place of departure is the seat of ONEA.
7. Bids must be submitted to the above address no later than 14/08/2017 at 9:00 am (Universal Time).
8. Tenders must include a guarantee of the offer for an amount of forty million (40, 000, 000) FCFA.
9. Tenders will be opened in the presence of representatives of tenderers who wish to do so at the above address on 14/08/2017 from 09.00 hours (universal time).
10. The main qualification requirements are:
- to have an annual average turnover of CFAF 2 billion (CFAF 2 000 million) over the past five (5) years;
- have a line of credit of four hundred million (400, 000, 000) FCFA;
- have executed at least two (02) markets in the last five (5) years with a minimum value of CFAF 1 billion (1 000 000 000) each;
- have carried out at least one contract for the supply and installation of electromechanical or electro-technical equipment (electric pumps, electric motors, generators, transformers) for at least five hundred million (500 000) 000) FCFA;
- the personnel and equipment capacity as defined in the tender dossier.
See the tender document for detailed information.
11. The time limit for completion of the work shall not exceed eight (08) months.
12. Tenderers shall remain bound by their tenders for a period of ninety (90) days from the closing date for submission of tenders Or electrical engineering (electric pumps, electric motors, generators, transformers) for a minimum amount of five hundred million CFA francs; - the personnel and equipment capacity as defined in the tender dossier. See the tender document for detailed information. 11. The time limit for completion of the work shall not exceed eight (08) months. 12. Tenderers shall remain bound by their tenders for a period of ninety (90) days from the closing date for submission of tenders Or electrical engineering (electric pumps, electric motors, generators, transformers) for a minimum amount of five hundred million CFA francs; - the personnel and equipment capacity as defined in the tender dossier. See the tender document for detailed information. 11. The time limit for completion of the work shall not exceed eight (08) months. 12. Tenderers shall remain bound by their tenders for a period of ninety (90) days from the closing date for submission of tenders - the personnel and equipment capacity as defined in the tender dossier. See the tender document for detailed information. 11. The time limit for completion of the work shall not exceed eight (08) months. 12. Tenderers shall remain bound by their tenders for a period of ninety (90) days from the closing date for submission of tenders - the personnel and equipment capacity as defined in the tender dossier. See the tender document for detailed information. 11. The time limit for completion of the work shall not exceed eight (08) months. 12. Tenderers shall remain bound by their tenders for a period of ninety (90) days from the closing date for submission of tenders