Procurement Summary
Country: Brazil
Summary: Registration of Prices for the Eventual Hiring of a Company Specialized in the Full Execution of Solutions Relevant to Installation Services for Split Hi-Wall Air Conditioning Equipment, ...
Deadline: 29 May 2026
Posting Date: 15 May 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 141364834
Document Ref. No.: 90277/2025
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Object: Electronic Auction - Price registration for the eventual hiring of a company specialized in the full execution of solutions relevant to installation services for air conditioning equipment of the split hi-wall, floor-ceiling and cassette type, without provision of exclusive labor, to serve the Federal University of Santa Catarina (UFSC) UASG code: 153163 Notice from: 05/15/2026 from 08:00 to 11:59 and from 12:00 to 17:59 Proposal Delivery: from 05/15/2026 at 08:00 INSTALLATION OF A HIWALL SPLIT TYPE AIR CONDITIONING APPLIANCE, WITH CAPACITY OF 9, 000 BTU/H, COLD OR HOT/COLD CYCLE. THE INSTALLATION INCLUDES THE INTERCONNECTION BETWEEN THE EVAPORATOR UNIT AND THE CONDENSER, USING FLEXIBLE COPPER PIPE WITH MINIMUM THICKNESS OF 0.8 MM, DIAMETERS OF 3/8´ FOR THE SUCTION LINE (GAS) AND 1/4´ FOR THE LIQUID LINE AND LENGTH OF 3 M FOR EACH LINE, SHIELDED TUBE IN EXPANDED POLYETHYLENE WITH A THICKNESS OF 10 MM, INTERNAL DIAMETERS OF 3/8´ AND 1/4´ AND LENGTH 3 M FOR EACH DIAMETER (COATED WITH PROTECTIVE FILM RESISTANT TO UV, WEATHER AND IMPACT), PVC CRYSTAL HOSE FOR DRAINAGE OF UP TO 5 M LENGTH, FLEXIBLE PP ELECTRIC CABLE FOR EVAPORATOR-CONDENSER INTERCONNECTION, WITH GROUNDING ROUTE, MINIMUM GAUGE ACCORDING TO BRAND AND MODEL OF EQUIPMENT LENGTH OF 3M. INCLUDING POLYMER SUPPORT. Quantity: 169 INSTALLATION OF A HIWALL SPLIT TYPE AIR CONDITIONING APPLIANCE, WITH CAPACITY OF 12, 000 BTU/H, COLD OR HOT/COLD CYCLE. THE INSTALLATION INCLUDES THE INTERCONNECTION BETWEEN THE EVAPORATOR UNIT AND THE CONDENSER, USING FLEXIBLE COPPER PIPE WITH A MINIMUM THICKNESS OF 0.8 MM, DIAMETERS OF 1/2´ FOR THE SUCTION LINE (GAS) AND 1/4´ FOR THE LIQUID LINE AND A LENGTH OF 3 M FOR EACH LINE, SHIELDED TUBE IN EXPANDED POLYETHYLENE WITH A THICKNESS OF 10 MM, INTERNAL DIAMETERS OF 3/8´ AND 1/4´ AND A LENGTH OF 3 M FOR EACH DIAMETER (COATED WITH RESISTANT PROTECTIVE FILM...
Documents
Tender Notice