ORGANISATION INTERNATIONALE POUR LES MIGRATIONS (OIM) has floated a tender for Realization of Four (04) Positive Boreholes Equipped with Human-Powered Pumps in Fataki Health Zones. The project location is DR Congo and the tender is closing on 25 Apr 2022. The tender notice number is , while the TOT Ref Number is 65085372. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : DR Congo

Summary : Realization of Four (04) Positive Boreholes Equipped with Human-Powered Pumps in Fataki Health Zones

Deadline : 25 Apr 2022

Other Information

Notice Type : Tender

TOT Ref.No.: 65085372

Document Ref. No. :

Competition : ICB

Financier : Other Funding Agencies

Purchaser Ownership : Public

Tender Value : Refer Document

Purchaser's Detail

Purchaser : ORGANISATION INTERNATIONALE POUR LES MIGRATIONS (OIM)
Sis au 372 Avenue Colonel Mondjila, Bâtiment 58, Concession Utex/Immotex, Ngaliema, Kinshasa, Tél: +243 81 032 5533
DR Congo
Email :iomkinshasa@iom.int/ rfqdrc@iom.int

Tender Details

Tenders are invited for Realization of Four (04) Positive Boreholes Equipped with Human-Powered Pumps in Fataki Health Zones (1 in lokpa1 and 1 in Kpawa), and in the Angumu Health Zone (1 in Uyandu and 1 in Udruwa) in Mahagi Territory;
1 General Site Installation
1.1
Supply and Removal of Materials and
Ff 4 Staff
2
Geophysical Location of
Site (S
2.1
Electric Drag Sounding
Multidimensional Electricity and
Website Report 4
3 Drilling
3.1
Diameter Rotary Drilling
9--7/8 with or without Injection of
Mud, Supply and Removal of Casing
Provisional. Ml 60
3.2
Down-the-Hole Hammer Drilling
Diameter 6--1/2 Ml 140
4 Equipment
4.1
Pvc Supply and Installation
Solid 5-- (11 Pvc of 3 M) Lm 132
4.2
Supply and Installation of Tubes
5-- Strainers (6 Pvc of 3m) Ml 72
4.3 Decanter and 1 Ml Stopper Ml 4
4.4
Supply and Installation of the Filter Bed
(220 L Per Borehole) L 880
4.5
Supply and Installation of the Packer
Benthonic over 3 M Borehole 4
4.6 Rough Fill Borehole 4
4.7 Cementation over 5 M Borehole 4
5
Flow Test Development
Pumping
5.1
Air Lift Development for 4
Hours until Water is Available
Clear Drilling 4
27
5.2
Test Pumping
Of Flow for 4
Time
Three-Tier and Lift
1
H
. Drilling
4
6
Physical Analysis
-Chemical and
Bacteriological Water in a
Approved Laboratory
6.1
Collection of Water Samples,
Transportation, Analysis and Reporting
And
Forag
And
4
7
Construction of the Coping
7.1
Curb (Cleaning Slab, Channel
Evacuation of Waste Water, and
Sump) Borehole
4
7.2
For
Urniture and Installation of Pump
Human Motricity
And
At
Adapted Ff
4
7.3
Construction of a Mu
Closing Ret
With 3mx Door
3mx1.20m
F
F
4
7.4
Oim / Donor Visibility on the
Fence
E Ff
4
8
Training of Management Committees
Points of
Water Ff
4
9
Cash Supply
Tool and Parts
Spare Parts for Repairing
Ff Pumps
4
More about this Source Textsource Text Required for Additional Translation Information
Send Feedback
Side Panels

[Disclaimer: The above text is machine translated. For accurate information kindly refer the original document.]

Documents

 Tender Notice