Cross Icon
Cross Icon

Purchase of a Heating Boiler for Kgu Oosh Village. Tender - 141809104

The STATE INSTITUTION "DEPARTMENT OF EDUCATION FOR THE ASTRAKHAN DISTRICT OF THE EDUCATION DEPARTMENT OF THE AKMOLA REGION" has issued a Tender notice for the procurement of a Purchase of a Heating Boiler for Kgu Oosh Village. Pervomayka, Amt: 3075437.00 in the Kazakhstan. This Tender notice was published on 22 May 2026 and is scheduled to close on 08 Jun 2026, with an estimated Tender value of KZT 3075437.00. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 141809104, while the tender notice number is 17004451-2 and Registering on the platform.

Expired Tender

Procurement Summary

Country: Kazakhstan

Summary: Purchase of a Heating Boiler for Kgu Oosh Village. Pervomayka, Amt: 3075437.00

Deadline: 08 Jun 2026

Posting Date: 22 May 2026

Other Information

Notice Type: Tender

TOT Ref.No.: 141809104

Document Ref. No.: 17004451-2

Competition: ICB

Financier: Self Financed

Purchaser Ownership: Public

Tender Value: KZT 3075437.00

Purchaser's Detail

Name: Login to see tender_details

Address: Login to see tender_details

Email: Login to see tender_details

Login to see details

Tender Details

Lots: Water heating boiler. Thermal power - not less than 0.257 Gcal/hour. Heated area of ​​at least 3000 m². Heated volume is not less than 9000 m³. Overall dimensions of the boiler: length not less than - 2030mm, width not less than -1230mm, height not less than -2200mm. Working pressure no more than -0.3 MPa. Flue gas temperature is at least 150-170 ºС. Type of fuel: solid (coal). A method of burning fuel on a grate, without forced air supply. Efficiency (hard coal/brown), %81-83/75. Estimated fuel consumption at maximum power, kg/hour Karaganda coal -63. Steel water heating boiler with manual combustion chamber using solid fuel, manufactured in accordance with GOST 30735-2001. The boiler is designed in a horizontal design. Without brick lining. Boiler hydraulic diagram allows you to work with a temperature schedule of up to 115 ºС. The coolant temperature at the boiler outlet is no more than -95ºС. The base of the boiler is made of a pipe with a diameter of 159 mm and a wall thickness of 5 mm; the front and back sides of the base are made up of a water jacket. The boiler is made with a rectangular base, the upper part is semicircular in shape with the placement of overhead pipes. The water jacket of the combustion part is made vertically from pipes with a diameter of 76 mm in the amount of 36 pieces, with external thermal insulation. Firebox completed elliptical shape made of steel 6 mm thick. The combustion door is equipped with a double bumper. Flue gases exit in the front part of the furnace through chimneys with a diameter of 219 mm, with a wall thickness of 5 mm, in the amount of 2 pcs., with...

Documents

 Tender Notice


Request Demo
GiZ Tenders India

Procurement Documents for Kazakhstan

Access a comprehensive library of standard procurement documents specific to Kazakhstan. Here, you'll find all the essential forms, guidelines, and templates required for tender applications and submissions in Kazakhstan

Explore Procurement Documents for Kazakhstan


Want To Bid in This Tender?

Get Local Agent Support in Kazakhstan and 60 More Countries.

View All The Services


View Tenders By


Publish Tenders


Have Any Dispute With The Purchaser?