Request for proposals are invited for PREVAIL AMD Office Expansion .
Request for Proposal
PREVAIL AMD Office Expansion
Issue Date: September 30th, 2020
Closing Date: October 23, 2020
Expected Award Date: November 06, 2020
1. BACKGROUND
PREVAIL/FHI Clinical is seeking proposals for licensed contractors to provide design and installation services for modular offices (created from pre‐fabricated trailers or shipping containers procured by contractor) to be installed at the University of Liberia A.M. Dogliotti Campus. The plot of land is on the UL Dogliotti campus, adjacent to the building where offices have been recently renovated. The Contractor shall propose milestones based on scope of work completed. The amounts for each milestone will be paid upon the completion and acceptance by FHI Clinical of each milestone deliverable. Work will begin in November 2020.
2. SCOPE OF WORK
PREVAIL/FHI Clinical is seeking licensed contractors to setup of ten (10) offices that will accommodate 30 members of PREVAIL-s team in addition to a small reception area, male/female washrooms, and a staff utility room. There is a downward slope at the far end of the property, and it will be necessary to make a level ground and plinth to support the installation of the office units; these works should be a consideration in the proposal and all the bidders are required to visit the site prior to submitting their proposals. Please reach out to Julia Lysander,
[email protected] to schedule your visit.
Offices are as described below:
1. 1 Office for 4‐6 people plus a meeting table that can seat 4‐6 people
2. 1 Office for 3 people
3. 1 Office for 2 people
4. 1 Office for 2 people
5. 1 Office for 4 persons
6. 1 Office for 4 persons
7. 1 Office for 4 persons
8. 1 Office for 4 persons
9. 1 Office for 4 persons
10. 1 Office for 1 person
Additional requirements for the office space should include:
Doors and windows (frame, sheath and waterproof all openings), framing walls, partitions to create office spaces, installation of smooth and durable floors, ceiling lights and electrical outlets to support the requirements of a busy office environment.
Adequate ventilation and air conditioning; the distribution of the air conditioning units including their BTUs should be clearly identified in the design.
Seal all cracks and install channels/gutters for rain and tropical conditions.
Design consideration to account for erosion and flooding risks at the site.
Insulation against heat and vapor barriers to prevent condensation from forming behind walls.
Adequate supply of water to the office block and the management of wastewater and sewage. A
detailed designed of the plumbing system should be included in the design.
Safe connection to an electrical supply that can support all equipment and air conditioners. A detailed
design of the electrical installations to connect to local and generator powers should be included in
the design.
Exterior appearance should be clean, neat, and harmonious with the other buildings on the A.M.
Dogliotti campus.
All units must meet appropriate building occupancy regulations including a proposal for a fire safety
plan.
Ability to locally source all materials and equipment for the project including the required shipping
containers.
Demonstrated ability to create a safe and secure work environment without disrupting activities at
the site or causing unsafe conditions for visitors and workers.
Demonstrated to operate within the constraints of resources and space, the offices will be designed
and constructed in accordance with the standards established by the Liberian Ministry of Public Works.
3. SUBMISSION REQUIREMENTS
Offerors should read the following proposal instructions carefully. The complete application package
should include:
Narrative proposal demonstrating the applicant-s capability for doing the work, descriptions of
previous experience doing similar work in Liberia, and any other considerations that may provide
added value. Include confirmation of availability to start work immediately.
Design and floor plan and demonstration of engineering expertise to ensure successful completion of
the project
Cost proposal including a breakdown of labor, materials and any other supplies needed to complete
the work. The cost proposal should also include the Offeror-s proposed milestone payment
schedule.
Resumes of proposed staff. Must have at least 5years- experience in similar work and a detailed
staffing plan to manage the project. A mitigation plan outlining the management of unexpected
issues such as a strategy for catching up on delays should be also included in the proposal.
Offeror shall provide any requested revisions to the FHIC subcontract template at the time of
proposal submission. Requests for changes to contract terms and conditions will not be considered
after the proposal period closes
Three references from former clients
Applicants are responsible for the review of the terms and conditions provided in the attachments
and listed below. Applicants must provide full, accurate, and complete information as required by this
solicitation and its attachments. Incomplete application packages will not be considered.
EVALUATION AND SCORING CRITERIA
Selection will be based on best value, weighing price against technical factors as outlined below:
Please outline the evaluation criteria based on a 100‐pt. scale.
1. Technical Proposal / Organizational Capabilities - 45
2. References - 25
3. Total Cost ‐ 30
SUBMISSION INFORMATION
All responses to this RFP must be submitted electronically and received no later than 5:00 PM
GMT October 23, 2020 to
[email protected] in either Microsoft Word or PDF format.
QUESTION & ANSWER PERIOD
Questions will be accepted until October 16th.
OFFER
An Offer will be made by October 26th
AWARD PERIOD
The award period will run from November 2020‐Proposed timeframe proposed by the Contractor
LOCATION: Monrovia, Liberia
FHI Clinical Disclaimers
FHI Clinical reserves the right to cancel the solicitation and not make an award in response to
proposals submitted to this RFP.
FHI Clinical may reject any or all responses received
Issuance of the solicitation does not constitute an award commitment by FHI Clinical
FHI Clinical reserves the right to disqualify any Offeror based on failure of the offeror to follow solicitation instructions
FHI Clinical will not compensate any offeror for responding to this solicitation
FHI Clinical reserves the right to issue award based on initial evaluation of offers without further discussion
FHI Clinical may choose to award only part of the activities in the solicitation, or issue multiple awards based on the solicitation activities
FHI Clinical reserves the right to waive minor proposal deficiencies that can be corrected prior to award determination to promote competition
FHI Clinical will be contacting each offeror to confirm contact person, address and that bid was submitted for this solicitation
FHI Clinical reserves the right to issue award based on initial evaluation of offers without further discussion
FHI Clinical may choose to award only part of the activities in the solicitation, or issue multiple awards based on the solicitation activities
FHI Clinical reserves the right to waive minor proposal deficiencies that can be corrected prior to award determination to promote competition
FHI Clinical will be contacting each offeror to confirm contact person, address and that bid was submitted for this solicitation