Request for proposals are invited for SNCFT Network Upgrade Project: Development of a Company Development Plan.
Executing Agency (Owner):
Name of the Entity selecting and hiring the Consultant in subcontracting
National Society of Tunisian Railways (SNCFT)
Tunis City Station
Place Barcelona Tunis RP 1001, Tunis
The Contact Person of the Client:
Mr. Mehdi NaijaCentral Director - Head of the Passenger Transport Business Unit in the Suburbs of the Sahel
National Society of Tunisian Railways (SNCFT)
Tunis City Station
Place Barcelona Tunis RP
1001, Tunisia
[email protected]Project description:
The European Bank for Reconstruction and Development (the "EBRD" or the "Bank") has granted a 160 million euro loan to the Tunisian National Railway Company ("SNCFT" or the "Customer") for fund a network modernization program that will include:
The doubling of the terminal section of the electrified railway line in the suburbs of the Sahel between Moknine and Mahdia (Line 22)
Signaling of stations and lines between the cities of Monastir and Mahdia, including the adaptation and rehabilitation of existing signaling facilities,
The acquisition of six electric multiple units (EMUs), and
The modernization of the West-South railway line between Tunis and Kasserine (Line 6), the development of stations and tracks and, the rectification of the route, and the signaling of the stations and the lines between Jebel Djeloud and Gaafour, and the construction of a fiber optic telecommunications link between Jebel Djeloud-Dahmani-Kef and the track renewal works (collectively referred to as the "Project").
The Tunisian rail network (SNCFT) covers 2, 165 kilometers and covers most of the country. Of the total length of 2, 165 kilometers, 471 kilometers of track are at standard gauge and 1, 686 kilometers at gauge and 8 kilometers at double gauge.
The project includes the following elements:
For line 22 (Sousse - Mahdia)
Infrastructure and electrification works to double the section between Moknine and Mahdia,
Rehabilitation works for stations, stops and technical rooms,
Two rail / road leveling works to remove two level crossings,
Signaling of five (5) stations and signaling of the line between Monastir and Mahdia, including the adaptation, rehabilitation and / or renewal of existing signaling installations (interlocking systems, level crossings and automatic light block system) ) between South Sousse and Mahdia,
Centralized control station), and
Acquisition of six EMU trains.
For line 6 (Tunis - Kasserine)
Rectification of the route of the line between Bir Mcherga and Sers,
Renewal of the track and ballast (RGB) over 135 kilometers spread over the entire line,
Signposting of eleven (11) stations and signaling of the line between Djebel Djeloud and Gaafour, including the renovation of the railroad tracks lane,
Installation of signaling equipment and integration of certain level crossings,
Comfort of the platforms and reinforcement of the structures, and
Construction of a fiber optic transmission link between Jebel Djeloud and Dahmani and between Salines and Le Kef.
Until 2010, traffic was reasonably stable. SNCFT transported about 10 million tonnes of goods per year, including 7 million tonnes of phosphate, and 40 million passengers, of which 6 million used mainline services. However, in 2011, much of the phosphate transport was transferred to the road network and there were also sharp declines in general cargo and non-urban passengers related to the Arab Spring and economic recession. Since then, traffic has partially recovered, but remains weaker than in 2010.
SNCFT is a public corporation that is responsible for the operation and maintenance of the network. The State makes annual payments to support suburban services in Tunis and Sousse, as well as some low-density branch lines. She is also responsible for infrastructure investments. However, the decrease in traffic in 2011 has had a serious impact on SNCFT's financial situation and there has been a gradual deterioration in the state of the infrastructure, which has had a negative impact on the punctuality of trains and the duration of the courses.
To meet the needs of SNCFT's Transportation Business Units, the network therefore needs a complete upgrade and improved operating conditions. In addition to upgrading the infrastructure, there are long-term considerations that need to be considered and defined as:
Electrification of the main lines network;
The conversion of the metric gauge network into a normal gauge network;
The construction of new high-speed lines to ensure integration with other Maghreb networks;
The modernization and generalization of railway signaling systems and telecommunications and all other projects aimed at strengthening security and improving the quality of service
Construction of new lines and / or restoration of closed lines to support national priorities for development and economic, social and technological growth of the country and in particular of the landlocked areas. These must take into account major investment projects in other sectors including transport and industry:
Port of Enfidha (construction and operation of a deep-water port and logistics area);
Enfidha Airport;
The pilot mining project of Sra Ouertane (treatment and exploitation of phosphates in the Ksour region, in the Kef governorate);
The branch with the national logistics zones provided for in the National Transport Plan by 2040;
The development of parallel commercial activities enhancing the assets put by the state at the disposal of SNCFT;
The policy of acquisition of rolling stock;
Rolling stock maintenance policy and associated institutions;
The maintenance policy of the infrastructure and the superstructure.
Description of the Mission:
SNCFT now wants to hire a consultant (hereinafter referred to as the "Consultant") who will support the Company's efforts to set investment priorities until 2025 and to develop, in conjunction with SNCFT, the main lines of action. a development strategy covering at least the above-mentioned areas (hereinafter referred to as the "Mission").
The objective of the Mission is the development of the Company's Development Plan and the definition of investment priorities until 2025.
To achieve this goal, the Consultant will:
Task A: Evaluate the chosen interim development plan, taking into account that the presence of the two spacings (metric and normal) considerably hampers the development of the infrastructure as well as the electrification of the main lines of the SNCFT network.
Task B: Develop a company development plan until 2025.
Task C: Define the priorities for the modernization and development of SNCFT's rail network until 2025.
Task D: Establish a general vision of the master plan for the development strategy of the Tunisian rail network in the 2025 and 2040 horizons in order to allow SNCFT to rationalize its future investments for both infrastructure and rolling stock.
Consultant Selection Procedure: Open Competition Selection in One Step
Interested companies or groups of companies are invited to submit a Technical and Financial Proposal.
Start Date and Duration of Mission : It is expected that the total duration of the Mission (including the submission of final reports for all tasks) is 24 months .
Estimated Cost of the Mission: EUR 500, 000 (excluding VAT).
Source of Funding: The contract should be financed by the EBRD. Selection and procurement are subject to the availability of funds.
Eligibility: There is no eligibility restriction based on the consultant's country of origin.
Submission Requirements : In order to determine the capacity and experience of Consultants wishing to be selected, the Consultant must submit a Proposal in accordance with the RFP.
Important Notes:
1. Selection will normally be made among the Proposals received in response to this notification only, based on the selection criteria set out in the RFP. The highest ranked Consultant will be selected and invited, subject to the availability of funds.
2. All updates and clarifications of this contract notice and / or RFP will be announced as updated in this notice without further notification. In the event of a change to the RFP, consultants will need to download the updated version of the RFP. Consultants are required to periodically check the notice for updates. Failure to take into account updates during the preparation of the proposal may result in disqualification or penalties for evaluation scores.
[Disclaimer: The above text is machine translated. For accurate information kindly refer the original document.]