Procurement Summary
Country: Germany
Summary: Heating Center at the Zell-Weierbach School Campus, Extended Structural Work
Deadline: 20 Aug 2026
Posting Date: 05 Aug 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 146588127
Document Ref. No.: 541635-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45223220 - Structural shell work
45422100 - Woodwork
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Heating center at the Zell-Weierbach school campus, extended structural work Extended shell construction work Earthworks: - Excavated soil: approx. 1, 150m3 - Removal and disposal floor: approx. 2, 070 tons - Filling work areas: approx. 200m3 - Excavation for trenches and shafts: approx. 480m3 - backfilling v. Ditches and shafts: approx. 240m3 - electrical systems: 2 pieces. Cable pull shaft, approx. 600m cable protection pipe DN100 - Waste water installation: 2 pieces. Shaft, approx. 75m sewer DN110 - Rainwater installation: 2 pieces. Shaft, approx. 125m sewer DN110-DN200 - shoring work - Drainage work Reinforced concrete work: - Angle retaining wall H=310cm D=25cm: approx. 15 running meters - Support foundations LxWxH = 20x60x120cm: 3 pieces. - Strip foundation W=60cm H=75cm: approx. 22 running meters - Stb. base plate (WU) D=30cm: approx. 36m2 - Starboard walls (WU) D=30cm H=165cm including insulation: approx. 42m2 - Star walls C25/30 D=20-25cm H=approx. 290-460cm: approx. 105m2 - Stb. parapet C25/30 D=20cm H=47cm: approx. 25 running meters - Star ceiling C25/30 D=25cm: approx. 36m2 - R11 coating base plate: approx. 40m2 Wood construction work: - Columns/wall panels GL24c H=307cm D=12cm W=120cm: 3pcs. - Wooden frame building walls post-transom 6x14cm H=270cm a=67.5cm: approx. 40m2 - Roof rack GL24c H=40cm D=12cm L=434cm: 6pcs. - Roof purlins GL24c H=24cm D=12cm L=406cm: 35pcs. - Edge beam/parapet beam GL24c H=95cm D=14cm L=406-504cm: 11pcs. - Three-layer panel 24mm (nailed roof area): approx. 115m2 - Emergency roof / 1st sealing layer: approx. 210m2 Doc Title: Heating center for the Zell-Weierbach school campus, extended...
Document Type: Contract Notice Reference Number: SOG_BS-2026-0148 Contract Type: works Authority Type: la Doc Title: Heating center on the Zell-Weierbach school campus, extended shell construction work Dispatch Date: 2026-08-04 Publish Date: 2026-08-05 Submission date: 2026-08-20
Documents
Tender Notice