EPC Turnkey Contract for the Engineering, Supply of Equipment, Construction, Commissioning... Tender

RUZIZI III ENERGY LIMITED has floated a tender for EPC Turnkey Contract for the Engineering, Supply of Equipment, Construction, Commissioning and Testing of the Power Plant and the Transmission Line for the Project. The project location is Rwanda and the tender is closing on 12 Jan 2022. The tender notice number is , while the TOT Ref Number is 59918482. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Rwanda

Summary : EPC Turnkey Contract for the Engineering, Supply of Equipment, Construction, Commissioning and Testing of the Power Plant and the Transmission Line for the Project

Deadline : 12 Jan 2022

Other Information

Notice Type : Tender

TOT Ref.No.: 59918482

Document Ref. No. :

Competition : ICB

Financier : European Investment Bank (EIB)

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : RUZIZI III ENERGY LIMITED
Sanlam Tower, Wing 4A, 4th Floor, KN 67 St 10, Kigali
Rwanda
Email :RuziziIII_EPC_InitialSelection@ruzizienergy.com

Tender Details

Tenders are invited for EPC Turnkey Contract for the Engineering, Supply of Equipment, Construction, Commissioning and Testing of The Power Plant and The Transmission Line for The Project (RIII-EPC Contract).

This project will include the design, construction, commissioning, testing, operation and maintenance of (i) a hydroelectric power plant with an installed capacity of 206 MW, including an embankment dam, 45 meters high with an annex spillway, a low-level landfill and an ecological flow power plant, a supply tunnel lined with concrete, 3.8km long and 6.7m in diameter connecting the dam reservoir to the power plant, to the pipeline forced a power plant comprising three production units type Francis, access roads from Bugarama (Rwanda) and Kamanyola (DRC) to the dam site, as well as all auxiliary and ancillary works (the “Plant”) and ( ii) a 7.3 km critical-double transmission line used to evacuate electricity from the Plant to the Kamanyola distribution station (DRC) (the “Transmission Line”).

[Disclaimer: The above text is machine translated. For accurate information kindly refer the original document.].

Documents

 Tender Notice