Quotation are invited for Drill Well, Water Tower, Solar Energy Control Water System & Construction of Gender Sensitive Latrine, in Two Counties Considering Four Communities.
1. CONTEXT/JUSTIFICATION
As Plan International moves to a new global strategy (2017 – 2022) geared towards ensuring that 100 million girls learn, lead, decide and thrive, Country Offices (COs) have begun to align programmes and projects to contribute to the overall objective of the new strategy. The vision of Plan International is to enhance the rights of children and equality for girls. In order to realize our objectives, we work for sustainable improvement of the general living conditions of children and adolescents as well as their families and their communities. Plan International Liberia work in collaboration with various Government institutions as well as local and national partners to achieve sustainable outcomes for children and young people in Liberia. as such, this Water Supply and Sanitation intervention is continuous and is in an effort to contribute to the pillar 2 goals set in the Pro-Poor Agenda for Prosperity and Development (PAPD) “to increase access to safe water supply and sanitation and improved hygiene practices, also promoting the achievement of the Sustainable Development goal 6 (Clean water and Sanitation) in Liberia”.
The funded WaSH project is Plan International Liberia sponsored project that is intended to increase and build viable Water and Sanitation Systems for communities. The project when completed will built the capacity of key community stakeholders to manage the new water system, sanitation, and hygiene (WASH) infrastructure in a sustainable way.
Specific strategies and interventions will be tailored to the needs of each site in Liberia” by Plan International until July 2019. As a pilot of our new WaSH intervention, the project will contribute directly by providing and increasing access to improved water systems for two communities in Bomi, and two communities in Lofa.
Significantly, Water supply and sanitation projects have impacts on people’s lives which extend far beyond the expected improvements to health and reduction in time spent collecting water. Impacts will also include significant improvements in household income levels and security of livelihoods base on a specific approach considering VSLA as a wheel of change for community members.
Increased school attendance will also occur along with better child care, social and cultural benefits such as reductions in stress levels taking place at household level, there will be increased status and self-esteem, better family and community relations, and increased ability to observe religious rites and customs at micro/community and meso/district level of the project. This will enable community to withstand resilience even if there is future outbreak of any disease.
The Child Sponsorship programming on WaSH is an ongoing months’ intervention (2018/2019) designed and will be implemented in collaboration with the WaSH Commission, public works and other key stakeholders to improve access to clean water supply and adequate sanitation including promoting good sanitation and hygiene practices.
Plan International Liberia is therefore inviting the expertise of reputable, qualified and experienced Contractors/Companies to pick up bid package that includes Blank Bill of Quantities, drawings & Site obligation form. Form shall be filled in and submitted along with bid documents for the construction of water tower, drill well & installation solar Grund-fos submersible pump with solar power plates, construction of a Gender Sensitive Latrine, including installation of hand wash basin. The proposed water systems are expected to be connected by extension to other parts of each of the selected communities within a specific kilometre range where concrete tap stands will be constructed to ensure easy access to safe drinking water.
2. OBJECTIVES AND EXPECTED RESULTS
2.1 Objective
To construct, complete and turn over 9.2m height water tower, submersible Grund-fos with solar energy control water systems, and standard Gender Sensitive Latrine with hand wash basins installed in latrines for four locations in two counties.
2.2 Expected Results
At the end of the activities, the below listed will be achieved;
1. The construction of all other works such as borehole, provision of poly-tank, installation of solar panel for the new water system considering the centrifugal Grund-fos submersible pump including water quality testing, and the
2. construction of Gender Sensitive Latrine considering pour flush design that keeps latrine smell better, free from flies including a well design reinforce concrete septic tank, soak away pits for sewage disposals and fluids control.
Facilities will be built to standard and quality as per the technical specifications and drawings.
The works herein are expected to be completed and functional considering a good waste management control for the facilities which will improves access to clean and adequate sanitation throughout the project life when completed
2.3 Relevant documents to submit:
Submission Requirements: (all copies should be in colour)
The Language of the bid is: English
The bid documents can be picked up: Beginning Monday, February 11th thru Wednesday February 15th 2019 from our
various offices: (Monrovia, Bomi and Lofa)
Requirement to obtaining the tender documents:
1. Our evaluation process
The process starts from the beginning of the purchase of the tender documents, therefore, it has become mandatory
that all contactors provide evidence of their business documents to the receptionist desks for a snap review before
picking up the tender document. We have a limited quantity of the bid of 10 per each lots and Contractor failing to
adhere to the mandate will not be allowed copy of the bid document. Issuing of the tender documents to contractors
are incumbent to the provision or demonstration of evidence of registered businesses in the Country.
2. Bid costA non-refundable fees of 50-USD
The following Schedules shall be submitted with the bid in this sequential order as listed below:
? Letter of Bid
? Completed Bill of Quantities and drawings Stamped and Signed in keeping with Plan’s submitted template
? Site verification form signed by the community and designated engineer who shall accompany the vendor or
contractor(s) during site visit
? Project Organization and Manpower Chart (Key Personnel)
? Methodology including your Program/Work Schedule for the execution of the project (Three - 3 months)
? Equipment listing, Schedule of Equipment to be utilized exclusively for the contract- It is obligatory by the
contractors participating to own drill equipment that can cover a depth range of 365 feet minimum.
? Evidence (photo) of similar or previous construction work completed
The Bidder shall also submit with its bid the following additional documents in the same manner but in one
package considering both the schedules above and the additional documents listed below for the purpose of
the evaluation and procurement processes:
Current Business Registration Certificate
Updated Current Tax Clearance Certificate
Article of Incorporation
Updated Ministry of Public Works (MPW) Certificate
Updated Association of Liberian Construction Company (ALCC) Certificate
Previous contracts completion certificate(s)
Updated WaSH Certificate
Bank Statement ( 2018 to 2019) (optional)
Bid security
Proof of an up to date office within the County/Country
Alternative bids “shall not be “permitted.
Alternative times for completion “shall not be “permitted.
Alternative technical solutions “shall not be” permitted.
The prices shall be quoted by the bidder in United States Dollars (USD)
The bid validity period shall be 60 days from the day of bid submission
In addition to the original of the bid, the number of copies are: Two (2), Original and Copy
And the price BOQ shall be written by hand and carefully calculated as per the organization requirement
All Bids shall be submitted in hard copy, logged in with date and time at our reception or security entry
For bid submission purposes only, the Employer’s address is:
Attention:
Country Director
Plan International Liberia
Behind Zone-3 Police Station, Oldest Congo Town,
Republic of Liberia
Bid can be dropped at our offices in Nimba, Lofa, Bomi and Monrovia
For any questions or queries needing the organization attention, please send before the bid
submission. Send to:
[email protected]Note: Queries or questions may subsequently be given redressed during site visit, therefore, it is mandatory that all
contractors participating should visit the site to verify the site conditions before the submission of quotations. The
designated engineer will sign off the site verification form to validate that contractors’ visited the sites. The signed
form will be considered during the tender and evaluation processes. Site visits are schedule per location as follow:
1. Lofa – Tuesday, February 19, 2019 9: 30 AM to 16:30 PM for Lot # 1, 2 & 3
2. Bomi- Friday, February 15, 2019 @ 10:30 AM to 15:30 PM for Lot # 4, 5 & 6
Upon completing the site visit, consider four working days to prepare and complete the tender documents and
submit as per the deadline specified below.
The Deadline for Bid Submission :
Date: Monday - February 25, 2018 (bid closes at 12 noon)
Time: 12 :00 Noon
The bidder may or may not be notified for the bids opening which shall take place in the conference room of the
organization at: 1:00PM on the 27th February 2019.