Object of the contractTaxiway construction work
Description: Contract notice: Taxiway construction work
Authority Type: Utilities entity
Contact Nature: Works
Procedure: Negotiated procedure
Document: Contract notice
Regulation: European Union
Award criteria: Lowest price
CPV code: 45235310, 45235100, 45112000, 45231100, 45311000, 45232453, 45111100, 34968000, 45235310, 45235100, 45112000, 45231100, 45311000, 45232453, 45111100, 34968000
CPV Description: Taxiway construction work.
Construction work for airports.
Excavating and earthmoving work.
General construction work for pipelines.
Electrical wiring and fitting work.
Drains construction work.
Demolition work.
Airport Surveillance System and Lighting System.
Generalunternehmer (GU) Errichtung Rollbahnen M5 und M6neu am BER.
Reference Number : EB-2017-0412 (Aktenzeichen des Auftraggebers)
Die Bauthe construction of the M6 new runway and the extension of the M5 runway with connection to the runway system. In addition, canals, rigs, and decentralized groundwater filtration systems are installed to drain the precipitation water.
Main site: Dahme Spreewald district.
The extension of the M5 runway and the future M6 runway complement the southern runway systemn SLB 07R / 25L. The construction of the new runways is intended for concrete construction. Here, connection areas on the SLB 07R / 25L are to be tested on the lower side of the building. The equipment of the airport-specific equipment (lighting, signage, etc.) must be extended.
To drain the precipitation water of the runways, canals, rigs and decentralized floor filters must be installed. The erectend drainage systems are located in the area of the southern landing stage system.
Commissioning of the runways is foreseen in the first half of 2019. The main part of the construction area is excluded from the air safety area according to - 8 LuftSiG during the construction period. Further work is to be performed in the area of air safety according to - 8 LuftSiG.
Provisional scope of services (all Mapprox. 25, 000 m New construction of airfield in concrete construction
- approx. 11, 000 m New flight area and shoulder in asphaltic construction
- approx. 25, 000 m Ground consolidation according to approx. ZTV concrete approx. 1, 000 m load distribution plate / support shaft
approx. 10 m dewatering channels
approx. 55 000 m earthworks (mineral and top soil)
approx. 35 000 m lawn sowing- approx. 1, 200 m New construction Drainage pipes up to DN 200
approx. 60 St. New construction of shaft constructions up to DN 1500
approx. 9 600 m Ground excavation for soil filter / gravel rig
- approx. 7 300 m Installation of PE-HD film for floor filter
- approx. 5 900 m Delivery / installation of filter material for floor filter
- ca. 3 300 m Delivery / installation of filter m- approx. 55 m Cable ducts -
approx. 1 900 m Cable protection ducts / cable ducts (DN 100 / cable ducts) DN 150)
- approx. 1 100 m Line for shaft dewatering DN 150
- approx. 55 St. New construction of shaft construction up to DN 1500 (shaft dewatering)
Approx. 4 500 m Secondary pipe (DN 100 / DN 150)
Airport-specific installations
- approx. 300 meters of edge fire, cans and signposts
- approx. 400 m fiber optic cable
approx - approx. 37 000 m Primaerkabel Befeuerung / Beschilderung
- approx. 5 000 m Secondary cable lighting / signposting
demolition / dismantling
approx. 6 100 m traffic areas asphalt and concrete construction
-/ Partial demolition of reinforced and unreinforced concrete
- approx. 200 m cable protection pipes incl. Shaft construction
other
- marking work
- extension of a firing station. at the time of the deadline, the extract should not be less than 6 months- 2) Written declarations with the following content and wording:
For the examination of exclusions within the meaning of -- 123 ff. GWB with regard to the applicant / applicant community, the applicants and the members of the applicant community have a written self-declaration according to a form provided on the tender platform.
3.) Written confidentialityfor procurement procedures. The tender documents will only be made available for the purposes of the competition by the tenderers or tenderers who have signed a corresponding confidentiality agreement(s):
All members of the applicant community or the representatives of the applicant community have to state that the formation of the applicant community is not a violation of - 1 GWB.
In addition, the members of the applicant association or the representative of the applicant community, to what extent the respective(s) concerned are commercially viable and commercial reasons, not to apply solely for the award of the contract, but to the nominated applicant group (s) Members of the applicant communityIf the applicant or the applicant company intends to use the resources of third parties / subcontractors or of affiliated companies to prove the economic or technical capacity to participate in the competition, the aforementioned explanations and proofs to items 1 and 2 are also valid in relation to third parties / subcontractors, w. (s) to be submitted to the affiliated companies.
In addition, a signed statement of the third / subcontractor (s) must be submitted, according to which he / she is willing to provide services for the candidate / contractor in this project "Proof of Entitlement" pursuant to Section III.1.1), Section 2 and Section 4, the confidentiality agreement pursuant to Section 3, as well as the declaration of use of third parties / subcontractors "and the" commitment declaration " G. Forms available on its website https://secure.berlin-airport.de/evergabe-extern/, which should be used by the applicants / candidate consortia as far as possibledocumentation. 1. Basic:
The place of remoteness operates an airport and is therefore active in the field of traffic. The distributorship carries out as a sectoral contractor pursuant to Art. - 100 para. 1, no. 2a GWB a negotiation procedure with participation competition according to the SektVO. The procedure is conducted as a negotiation procedure with participation contest (cf.Para. IV.1.1). This notice will start the participation contest in which the interested parties submit their invitation to tender with the information, explanations and evidence referred to in this notice. Only her successful application after a positive aptitude test and evaluation by the client leads to the dispatch of the order or VThe timetables in section II.2.7) shall be subject to reservation and adjustment and updating.
2. Information concerning the participation contest:
The participation applications and their attachments are to be submitted in duplicate (1 original and 1 copy, the documents are to be marked) in German language, I.1) above. The transfer shall be in writing-with an explicit reference to the file number (see point II.1.1) on the subject / envelope in which the application for participation is submitted and in the cover letter of the application for participation (submission by fax or fax to the designated contact point in electronic form, eg via e-mail, is not permissible). For the aforementioned Kennzeic(form).
Information is generally only given to such questions, which can be read by 26.10.2017 at the latest before 26.10.2017 before the expiry of the application period to the office referred to in section I.1) The question of whether or not questions are answered will not be answered-has to send an e-mail to the e-mail address
[email protected], including the name of the measure (see number II.1.1)) and the file number (see also II.1.1)) to be carried out. The authority will provide any information (including the forms) and answer questions from applicants for the competition, as well as other clarifications by the agency, ie the tender procedure, on the following website: https://secure.berlin-airport.de/evergabe-extern/. For this reason, the awarding authority recommends that all applicants should use the aforementioned link to retrieve current information and clarifications from the agency, as well as to respond to requests for tenders(EEE) of the applicant can not replace the submission of the supporting documents and declarations set out in point III.1) of this notice since the information and explanations required for prequalification are not compatible with the explanations and explanations required in this tender procedure Proofreading
The contracting authority shall not be reimbursed and remain the property of the contracting entity.
The contracting authority indicates that the content of this EU-wide publication is relevant only if the contract notice is published in additional advertising media and the advertising text is included in these additional documents Notices not exhaustiveg, inaccurate or altered.
Further mandatory information cf. URL https://secure.berlin-airport.de/evergabe-extern/.
Internet address (URL): www.berlin-airport.de
Directive: Classical Directive (2014/25/EU)