Contract notice: Risk or hazard assessment Tender - 31980868
Tender notice from Germany, published on 02 Apr 2019.
Executive Summary
The BUNDESAMT FÜR SEESCHIFFFAHRT UND HYDROGRAPHIE has issued a Tender notice for the procurement of a Contract notice: Risk or hazard assessment for construction in the Germany. This Tender notice was published on 02 Apr 2019 and is scheduled to close on 13 May 2019, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 31980868, while the tender notice number is 151939-2019 and Register on the platform.
Key facts
Summary
Contract notice: Risk or hazard assessment for construction
Object of the contract Risk or hazard assessment for construction Description: Contract notice: Risk or hazard assessment for construction Authority Type: Ministry or any other national or federal authority Contact Nature: Services Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: Lowest price CPV code: 71313410, 71520000, 71311300, 71313400, 71313410, 71314000, 71631420, 71313410, 71520000, 71311300, 71313400, 71314000, 71631420 CPV Description: Construction supervision services. Infrastructure works consultancy services. Environmental impact assessment for construction. Energy and related services. Maritime safety inspection services. Preparation of expert report on maritime safety suitability in the context of Preliminary examination of areas to be examined in the German AWZ in the North Sea and the Baltic Sea Reference Number: 0800Z12-1114 / 002/650 Expert opinion in accordance with - 12 (3) WindSeeG on traffic police suitability of the investigated areas in the EEZ of the North Sea and Baltic Sea with regard to the erection of offshore equipment. It should be possible effects of a development of the surfaces to be examined with offshore installations on safety and ease Main Site: Main Site: North Sea and Baltic Sea Offshore The main focus of this expert report on the assessment of the maritime traffic police suitability of the areas to be investigated is Presentation, analysis and assessment of the current traffic situation(Traffic structure and frequency, relevant traffic rules, VTGs, etc.) in the environment of the area under investigation and in the supraregional traffic area including a representation of the shipping routes, traffic relations and traffic rules, description and determination of the prevailing environmental conditions (climatic, meteorological-hydrological), as far as traffic relevant, Scenice Analysis of the risk of accident arising from the development of the area under investigation (risk assessment): taking into account the surrounding (prospective) development situation, thus taking into account the surrounding offshore installations (of the adjacent OWFs according to their actual or at least fixed planning pattern )in the traffic area concerned (cumulative consideration), when viewed within 20 nautical miles measured around the respective area, determined by the external surface area, area plans to be considered and the order of realization in accordance with the assumptions of the FEP in the current version, on the basis of models planning: nightlifeFEP, FEP distance requirements, the FEP estimated power to be installed, model wind farm specifications, Scenario 1 according to the FEP environmental assessment, a maximum number of installations per area will be determined and an equal distribution on the FEP Area. Presentation of possible concentration andnd Negative effects and the associated risks to shipping; Determination of the probability of collision occurring for manoeuvrable and non-manoeuvrable ships with the offshore installations; Exclusive consideration of ships that are subject to SOLAS agreements ( 500 GT), unless smaller ships can be assigned to specific areas and a comparable vessel No vessels of the German Navy, derivation, presentation and evaluation of any necessary risk-minimizing measures and the determination of the time of necessity, consideration / consideration of the effectiveness of already arranged / existing risk mitigation measures (AIS equipment, maritime observation / Traffic monitoring, stateEmergency trawler, private tow capacity), consideration of oil discharge rates as far as predictable, comparison and evaluation of the initial situation (traffic situation without development of the respective area) with the risk situation after development of the areas to be investigated on the basis of a forecasted future traffic development until the year 2030. Basis for the risk analysis and proofThe results of the working group "Approval relevant guideline values for offshore wind farms" of the BMV (I 2004 and II 2008). As a result, adding all collision risks by non-manoeuvrable and manoeuvrable vehicles of all ship types of commercial shipping on the various identified shipping routes in the area the respective area and all wIn the case of other projects in the same traffic area (cumulative consideration), the statistically expected period between two collisions (collision repetition rate) can be determined without taking into account further risk-reducing measures. Building on this, as far as the in the o. G. The acceptance thresholds worked out by the working group are not complied with, and risk-reducing measures are taken into accountThe results of the expert report are to be derived and presented in a generally understandable and transparent form. Reliability in the sense of -- 123 ff. GWB (see Article 57 Directive 2014/24 / EU) The details of the reliability according to -- 123 and 124 GWB as well as for self-cleaning within the meaning of -125 GWB must be stated in the form "Uniform European Self-Declaration"Companies are excluded if at least one reason for exclusion from -- 123 and 124 GWB exists and no self-cleaning within the meaning of -125 GWB took place. (optional exclusion criterion) a) the average annual turnover of the economic operator must have been at least 3 over the past 3 years (exclusion criterion): 600 000, 00 EUR proof: self-declaration; onDemand: Financial statements or confirmation by the tax adviser; b) The economic operator must have the following insurance from the start of the first service until the completion of all services (exclusion criterion): professional liability insurance / public liability insurance. The insurance coverage must be at least: for personal injury 10 000 000, 00 EUR For other damage 2 000 000, 00 EUR In any case, proof must be provided that the maximum amount of compensation per insurance year is at least twice the amount insured. The economic operator has at least all compulsory insurance required under German law to provide the services and activities required by the contractrequired and those which would be required if the equipment, vehicles and machinery used were registered under the German flag or registered or operated in the Federal Republic of Germany. Proof: Self-declaration; Upon request: Confirmation by the insurance company that appropriate insurance cover may be granted at the beginning of the benefits The qualifications to be submitted in the tendering procedure The requirements resulting from the conditions of participation (section III) are minimum requirements whose non-compliance leads to exclusion. Therefore, information must be provided by the economic operator on all points. Please note this when tendering with the required sorgfalt. For the requirements of the conditions of participation, the trader is initially only required to make his own statements on the required statements, unless otherwise specified. Missing information and self-explanations lead to the exclusion of the tenderer. The statements made in the self-declaration can not be provided by the client insofar as already by pre-qualification of the evidences has been provided by requesting the corresponding documents, such as certificates, approvals and similar checks. Upon request, the requested documents must be submitted within the reasonable deadline specified with a request. If the deadline expires without the requested documents being completely available to the client, this will lead to the exclusion of the BThe fulfillment of some eligibility criteria may possibly take the form of a prequalification code of the respective prequalification system (PQ, eg https://amtliches-verzeichnis.ihk.de, https://www.pq.org/) which corresponds to the CPV code of the subject of the contract -verein.de/) depending on the content of the respective pre-qualification of the economic operator. To submit with the offer: - Eigen On request: - supplementing the performance of other contractors with the names of other contractors, - letter of commitment services of other undertakings, - letter of commitment, economic suitability lending, certificates and other documents of qualification and qualification, - life courses, - Letter of Reference from the Reference Issuer, - Financial Statements or Confirmationof the tax adviser, - Proof of coverage of the insurance. References: As far as references are required, each criterion can be proved with its own reference; Each reference can show multiple criteria at the same time. At least the following project-related information has to be provided for the references (see self-declaration form): - Principal with address, contact person and telefonnummer, - Name of the project, - Description of the service performed, - Date (day) of completion of the reference project, - Gross order value. Internet address (URL): http://www.bsh.de
The bid deadline for Contract notice: Risk or hazard assessment for construction was 13 May 2019. Bidding is closed.
This tender has been issued by BUNDESAMT FÜR SEESCHIFFFAHRT UND HYDROGRAPHIE in Germany.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 71313410 - Risk or hazard assessment for construction, 71520000 - Construction supervision services, 71311300 - Infrastructure works consultancy services, 71313400 - Environmental impact assessment for construction, 71314000 - Energy and related services, 71631420 - Maritime safety inspection services.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 31980868. The purchaser document reference is 151939-2019.