Object of the contractEnvironmental services
Description: Contract notice: Environmental services
Authority Type: Regional or local authority
Contact Nature: Services
Procedure: Competitive dialogue
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 90700000, 71313000, 90712000, 90710000, 90711000, 90711300, 90711400, 90721700, 90700000, 71313000, 90712000, 90710000, 90711000, 90711300, 90711400, 90721700
CPV Description: Environmental services.
Environmental engineering consultancy services.
Environmental planning.
Environmental management.
Environmental impact assessment other than for construction.
Environmental indicators analysis other than for construction.
Environmental Impact Assessment (EIA) services other than for construction.
Endangered species protection services.
Ingenieurbiologisches Gutachten Iller.
Within the framework of the Illeriological Survey of Iller, an ecologically based minimum discharge is to be determined for the discharge routes of the Lower Iller (km 52.925 to km 0.000 mowing into the Danube). The minimum flow is distributed over the Iller-Mutterbett as well as to the side arms planned along the Lower Iller for habitat improvement. In addition, in the case of very small discharges in the Iller in the power plants of the power plant operators at least Lower Iller (km 52.925 to mowing to the Danube). This is spread over the Iller-Mutter bed as well as the side arms planned along the Iller to improve habitat. It is also necessary to determine which effluent must remain at least in the times of very small discharges in the power plant operators' power plants.
The minimum outflow must be adequate to achieve the management objectives derived from the EC WFD or the WFDto enable ecological potential as well as good ecological condition. In this respect, priority should be given to the requirements of potentially natural fish fauna. However, the other biological quality components must also be taken into account.
For the planned side arms, which are planned as additional types of habitats parallel to transverse structures along the river Illerthe following parameters must be derived against the background of the management objectives:
- necessary endowment, including possible annual and outflow-dependent dynamics,
- dimensioning and design of the water section, taking into account the type of flow of the River Iller; It is to be deduced from the minimum flow ratein order to create the hydromorphological conditions for the achievement of the management objectives, a habitat offer for the potentially natural aquatic fauna and flora is created in the habitat network of mother bed and planned side branchess. The required derivation has to be based on the natural conditions of the water type 4 large rivers of the Alpine foothills.
The resulting life expectancy is to be determined separately and deducted to derive the necessary minimum outflow for the Iller-Mutterbett and the planned side arms make sure that in the jamthe critical values of physico-chemical parameters can be safely adhered to. It is essential to limit the water temperature during summer heat-up periods as well as to consider the gas content of the water (oxygen concentration, gas overloading).
Conditions to be taken into consideration:
- Use of water power: There are four discharges100, 4, 90 and 17 m / s; - There are 32 weirs and soles (use of hydroelectric power, stabilization of the sole). With one exception, the foundation structures can not be dispensed with. There is no question of a significant reduction in the congestion target. This does not rule out structural changes in transverse structures for the creation / extension of zones with a flow path character. At-all transverse structures, if not already done, are to produce the biological continuity. Basic decisions concerning the technical design of the necessary equipment for the production of the through-flow are laid down in the water development concept (GEK) as well as the implementation concept in the designThe number and approximate position and length of the side arms are in the concept of the development of the watercourse. This is due to the fact that the amount of water in the river bed is limited by the amount of water used (GEK) as well as the designf of the implementation concept. The same applies to further measures planned for the revaluation of the body of water in the mother bed of the Iller.
- The interests of the species and biotope protection, in particular the NATURA 2000 areas situated on the Lower Iller shall be observed .2017) on the legal form and the right to signature(usually by extracting the commercial register from foreign applicants by means of a certificate from the competent authority of the country of origin in the case of companies which are not obliged to register in a commercial register, etc.) the proof must be free of doubt that the Pe(B) Candidates must sign a declaration signed by all members, together with their application for participation, stating the formation of a grouping of bidders in the case of bid processing, in of which all members are listed, in whichthe authorized representative is designated and that the authorized representative represents the members legally to the place of remuneration. It is not permitted to change the identity of the candidate or the applicant group. When submitting a contract, proof of the legal form and joint and several liability must be provided.
C) The application must be a declaration(in the case of applicants / bidders' associations for each member) that there are no exclusions according to - 123 and - 124 GWB (The required explanations are contained in the available sample) (A) Proof (issued after 1.1.2017) eoccupational liability insurance with a cover of at least EUR 1 500 000 in the case of personal injury and a cover of EUR 1 500 000 in the case of property and assets. The totals apply per loss (double-maximized). The written confirmation of the applicant's insurance to increase the professional liability cover to the required sums of coverage in the order or to the deduction(B) The application for participation must include an explanation as to whether the applicant would like to perform the contract with other companies and, if so, how the distribution of the service is carried out. An appropriate form will be made available for such declarations. At the earliest before placing your order is(c) The application for participation must include an explanation as to whether the applicant is to be involved in the performance (suitability lending) of the third companies which are involved in the execution of the application. An appropriate form will be available for such explanations-posed. A declaration of commitment by the third companies must demonstrate that they are available for the provision of services and are within the framework of financial and economic suitability.
D) The application for participation must contain a commitment declaration for public contracts which are covered by the Employees' Posting Act E) Explanation about-the applicant 's annual turnover (gross) in relation to the scope of the contract for the last 3 financial years. (F) Explanation of the annual average number of employees of the applicant in relation to the scope of the contract for the last 3 financial years A) The contracting authority will be responsible for the tenderer's tender, gie for all members of the consortium, third companies (suitability lending) or subcontractor, an extract from the commercial register according - 150a GewO at the Federal Office of Justice;
B) All declarations and proofs are to be submitted by the deadline. The tendering body reserves the right to provide non-clear information / documents in the course of an Au(C) Candidates are asked to submit their application for participation in the form of the completed application form, together with the necessary annexes (see www.vof.istw.de). (D) The application must be accompanied by a legally binding signature (original signature of a person who can be verified)e III.1.1- is entitled to carry on legal transactions for the applicant, or through the person appointed by applicant / bidding groups). Unsigned applications will lead to exclusion;
E) All information given by the applicant must be in German. Other translations or documents must be translated by officially recognized interpreters. Without such translation(F) Documents which go beyond the expressly required information and evidence are not intended and will not be taken into account in the evaluation;
G) The application documents must be submitted only in paper form DIN A4 and by post;
H) The application documents are marked with theI) The application documents shall remain with the customer and shall not be returned; (J) All questions concerning the procedure will be accepted only in writing, by e-mail to
[email protected]. Questions are answered centrally. All questions and the answers given will be published (anonymous) on the website of theall interested parties. This means that all interested parties have the same information / basics for their application. In other ways incoming questions are not answered, it is always referred to the indicated path via the e-mail. Therefore, interested persons have themselves the current state of this document and the information at the InThe following engineers were involved in the project:
- Bjoernsen Beratende Ingenieure GmbH Augsburg, Morellstr. 33, 86159 Augsburg; Blasy Dr. 0verland Beratende Ingenieure GmbH, Pfaffenwaldring 61, 70569 Stuttgart.
The documents prepared by the Bueros will be made available to all bidders in the course of further proceedings, so that all available information is available to the bidders. This balances the pre-eminence of these offices. The bureaus are not excluded from this award procedure(i) The competitive dialogue is to be implemented in two dialogue phases (probably KW06 / 2018 and KW10 / 2018). For selected bidders who do not receive the award, they will be awarded a 3, 000 EUR prize money without a profit share(according to VgV - 18 (10))
Internet address (URL): http://www.rp-tuebingen.de
Directive: Classical Directive (2014/24/EU)