Object of the contractElectronic, electromechanical and electrotechnical supplies
Description: Contract notice: Electronic, electromechanical and electrotechnical supplies
Authority Type: Other
Contact Nature: Supplies
Procedure: Competitive procedure with negotiation
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 31700000, 31710000, 31712117, 31700000, 31710000, 31712117
CPV Description: Electronic, electromechanical and electrotechnical supplies.
Electronic equipment.
Integrated circuit packages.
HF-Backplane_2020
Reference Number: 27/50067901
This tender covers the manufacture of 19 "" HF backplane frames. These frames are used to hold electronic modules of the control systems (so-called low-level radio frequency, LLRF) of the FAIR synchrotronsand storage rings.
Main Site: GSI Helmholtzzentrum f-r Schwerionenforschung GmbH
The scope of delivery includes the procurement of all required components, the manufacture and assembly of the RF backplane circuit board, the assembly and wiring of the frame, the documented testing including calibration of the supply voltages and the Delivery of the frames to the GSI. The scope of delivery does not includet the manufacture of the RF Maintenance and Diagnostics Module, i.e. the frames are made without this module. Therefore, only one type of PCB (RF backplane PCB) needs to be manufactured. The specially modified power supply for operating the frame is provided by GSI for assembly and does not have to be procured. The frames are im continuous operation over 20 years and more. Therefore, high demands are placed on the long-term stability of the printed circuit boards and on the quality of the components used. Email:
[email protected] Internet: http: //www.bundeskartellamt.de
The applicant / bidder is requested to clearly identify the parts of his application to participate (and later his offer, if applicable) that contain a trade or business secret. If this does not happen, the public procurement tribunal can, in the case of a review procedure, assume approval for inspection of its documents (Section 165 (3) GWB). The GSI isAs the awarding body, when initiating a review procedure, it is obliged to make the awarding files available to the public procurement chamber immediately (Section 163 (2), third sentence, GWB). 97 para. 6 GWB). Looks at an applicant / bidder interested in the orderviolated by not observing procurement regulations in his rights, the violation must be reported to the GSI within 10 calendar days (- 160 Paragraph 3 Clause 1 No. 1 GWB) apply to GSI by the deadline specified in the announcement for submitting applications (or offers)nd be made (Section 160 (3) sentence 1 no. 2-3 GWB).
Announcement ID: CXS0YYEYDTH
Internet address (URL): http://www.gsi.de