Object of the contractData services
Description: Contract notice: Data services
Authority Type: Other
Contact Nature: Services
Procedure: Competitive procedure with negotiation
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 72300000, 72212460, 72260000, 72262000, 72222300, 72300000, 72212460, 72260000, 72262000, 72222300
CPV Description: Data services.
Analytical, scientific, mathematical or forecasting software development services.
Software-related services.
Software development services.
Information technology services.
ENERA Prognosen zur Ermittlung des Netzzustands Erzeugungs- und Verbrauchsleistungen.
Reference Number : 17_401
Im Rahmen des vom BMWi gefoerderten SINTEG (Schaufenster intelligente Energie) Projektes eneraProduction and consumption forecasts are required for the subsequent assessment of future network conditions. These are to be provided as part of a service. In order to meet the requirements for the performance forecasts for later reuse in a grid condition forecast, the usual forecasting procedures within the framework of the service must be adapted or newly created
Continuing performance forecasts (generation, consumption) of a 20 kV distribution network are required. The forecasts are subsequently used by the client in a grid condition forecast in order to predict the future power flows in the electrical grid and to initiate measures for grid management as needed. For further processing of the forecast dataTo provide these in different aggregations, the 20kV network node level is the smallest required granularity.
For network management purposes, the forecast data is to be delivered continuously in a 15-minute interval with a 15-min resolution for the future six hours. In addition, the forecast of hour 6-48 is in a 1-hour interval with a 1-hour resolution
Lot 1: Generation forecast data
Due to the significant share of total installed generation capacity from renewable energies in the grid area, the main focus is on the prediction of generation output from wind energy and photovoltaic plants. Furthermore, the generation capacity of the other energy sources must be taken into account (biogas, CHP, etc.). The BereThe submission of the data is subject to the above conditions.
Further documents must be requested from the contact point (Mr. Alexander Delger, Corporate Purchasing,
[email protected]). The documents will be sent to you electronically.
If the number of suitable candidates is sufficient, at least 2, at most 5 candidates per lot will be involved in the negotiated procedure. The applicant selection fulfilledis a three-stage procedure:
1. Examination of the applications for participation
It will be checked whether the application for participation contains all the required information and documents. Missing information and documents must be submitted at the request of the client within a period of five calendar days. Applications for participation, which are still incomplete even at the end of the grace period, will not be considered.
2nd Formal aptitude test
It will be checked whether the candidate / consortium considers that the information and documents submitted by him / her are suitable to execute the services to be awarded in accordance with the contract. Insofar as an applicant / applicant community proves its economic and financial capacity and / or technical performanceUpon request, he / she has to provide evidence of the capacity of other companies within five calendar days that he / she will in principle have the funds of these companies at his disposal. This can be done, inter alia, by means of corresponding undertakings by the other company (see - 47 (1) Sect.VO). Differentiated suitability pWhen the number of suitable candidates exceeds the number of candidates to be involved in the further procedure, a differentiated aptitude test will be undertaken to reduce the number of candidates to a maximum of 5 applicants per lot. This examination is carried out on the basis of the information on already provided services comparable type acc. Para. III.2.3 No. 4 of the Bekan
Questions from the candidates regarding the aptitude test for participation in the awarding process
ENERA forecasts for the determination of the network status of generation and consumption
can be submitted by e-mail to
[email protected] by 22.11.2017. Unfortunately, later submitted questions can no longer be considered. The questions are continuously answered as promptly as possible and all ininterested parties. The latest answers will be sent to the applicants by 28.12.2017 at the latest.
The application forms and corresponding documents are completely in writing in a single copy (in the original) and electronically on a USB stick in German, stating the EU publication number and our file number 17_401
ENERA Forecasts forDetermination of network status Production and consumption services
to be submitted to the contact point in a sealed envelope with the inscription "Do not open!" Applications that are received late are not taken into account.
The client reserves the right to make statements and evidence in accordance with - 51 SektVO The requirements according to -- 160 para. 3 no.-4 and 135 (2) GWB.
Internet address (URL): www.ewe.com
Directive: Classical Directive (2014/24/EU)