Object of the contractComposting plant construction work
Description: Contract notice: Composting plant construction work
Authority Type: Regional or local authority
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 45253800, 45253700, 45200000, 45210000, 45220000, 45247110, 45253800, 45253700, 45200000, 45210000, 45220000, 45247110
CPV Description: Composting plant construction work.
Construction works work.
Engineering works and construction works.
Canal construction.
Planning, construction and commissioning of a tunnel composting plant with upstream batch Fermentation
Reference Number: 242_2018
Work Planning, Construction and InbeStart-up of a tunnel decanter with upstream dry fermentation according to the so-called batch process for a quantity of 20, 800 Mg / a when designed for 120% of the amount of waste delivered per week.
Main Site: Goettinger Entsorgungsbetriebe
After a fire event in August 2016, at the essential parts of the plant have been destroyed should be located at the site of the Bioenergy Center Koenigsbuehl der Goettinger disposal companies Reconstruction is carried out as tunnel composting with upstream partial flow treatment. The subject of the work is the planning, erection and commissioning of a tunnel decanter with upstream dry fermentation according to the so-called batch process for a quantity of 20, 800 Mg / a when designed for 120% of the average amount of waste delivered per week. An NAeration and continuous dry seasoning are not subject to the invitation to tender and are thus excluded from the scope of supply requested. At the beginning of the service on 17.5.2019, the end of the trial operation should take place until 30.11.2020
- current excerpt from the commercial register (not older than 6 months),
- From a contract value of 30.000 EUR the client becomes the bidder, on whose offer the contract is to be awarded, an excerpt from the commercial central register acc. - 150a GewO with the Federal Office of Justice request.
With the offer the following explanations are to be submitted for the non-existence of exclusion reasons:
- Self-declaration of the Bieter to compelling exclusion reasons according to - 123 GWB as well as according to Posted Workers Act (AEntG) and Minimum Wage Act- declaration by the tenderer on optional grounds of exclusion pursuant to section 124 GWB, - declaration by the tenderer that he has fulfilled the obligation to pay taxes, duties and contributions to the statutory social security system, - self-declaration, that the tenderer is not inadmissible in relation to the award
At the request of the contracting authority, the following evidence of non-existence of the grounds for exclusion must be provided:
Proof of compliance with the obligation to pay taxes and duties (not older than 6 months; the financial authority responsible for the bidder does not provide such evidence, which the bidder eb- evidence of compliance with the obligation to pay contributions to the statutory social security scheme (health insurance where most employees are insured less than 6 months), - current, d. H. on presentation still valid proof of membership in a professional association.
As far as the proof of suitability for a pre-qualification is successful
Specification of the tenderer's certificate number and naming of the prequalification list
General applies to the submission of required documents:
- for the subsequent request of documents applies - 16a EU VOB / A,
- the bidders have to specify for which power parts the use intended by subcontractors. The contracting authority refrains, from the bidders, in the eIn the event of a surcharge, the subcontractors' own declarations on compelling and optional exclusion grounds pursuant to - 123 GWB, AEntG, MiLoG, SchwArbG and - 124 GWB and for subcontractors the same NachweFor the main contractor, requests for and statements as to the main contractor are required. For the evidence contained in the pre-qualification list, the entry of the tenderer in the PQ is also accepted after the certificate number has been given. For references, however, the minimum standards specified in the tender documents apply.
- Bidders from other member states of the EU must be comparable in each casee provide evidence and explanations under the laws of the country in which they are established and attach a recognized translation; - for consortia, the current excerpt from the Commercial Register (not older than 6 months) and the documents for mandatory and optional exclusion according to - 123 GWB, AEntG, MiLoG, SchwArbG and - 124 GWB (here under III.1.1)) for each member of the grouping; in addition, all the required proof must be available in total.
- statement on the total turnover of the Bidder and its turnover with respect to the tendered services and the balance sheet total, respectively in the last 3 completed business years,
bank statement on liquidity and credit line (not older than 6 month(e).
Proof of insurance cover:
The tenderer must furnish proof of the following insurances, valid at the time of submission, with the above sums insured per claim, by submitting statements from the insurance undertaking. All insurances must also cover a selection fault when engaging subcontractors.
Public liability insurance (personal injury and property damage:-5 000 000 EUR (flat rate), property damage: 1 000 000 EUR, annual peak: 2 times each)
The contracting authority also accepts insurance with a sum insured of EUR 5 million as a lump sum for personal, property and property damage. The public liability insurance is to be maintained until the expiry of the last warranty period.
Environmental liability insurance (coverage summe: EUR 5 000 000, sublimit: EUR 1 000 000 for normal operations, annual salary: 3 times each)
The scope of the environmental liability insurance must be in accordance with the German General Liability Conditions (AHB). The risk of overarching damage (fire and explosion damage) is too insured with the coverage amount stated for the environmental liability insurancen. The scope of the environmental liability insurance must relate to the site including the surrounding area. The environmental liability insurance must be maintained up to 3 years after acceptance.
Furthermore, the existence of the following valid insurance policies must be demonstrated by submitting statements from the insurance undertaking:
- Transport insurance,
- MontageversIn the event that the required insurances do not exist at the time of the submission of the offer, the written declaration must be submitted by the tenderer, and in the case of the award of the contract, the abovementioned tenders Insurance contracts.
The tender documents will be available to all interested parties-by 30.1.2019 (application deadline) electronically available at https://www.meinauftrag.rib.de/public/DetailsByPlatformIdAndTenderId/platformId/3/tenderId/77564 as a reading version and for electronic retrieval.
Communication between the awarding authority and During the award procedure, the companies are basically informed about the eVergabe platform www.vergabe.rib.deorderlich that bidders have registered for the retrieval of the tender documents and for the electronic bid submission on the aforementioned eVergabe platform (https://www.meinauftrag.rib.de/public/registerCompany).For the submission of an offer in this procurement process the bidder client ava-sign of the allocation platform is not required.
Under http://meinauftrag.rib.de/hilfe/angebot-abgive-without-ava-sign.html are u. a. Training videos for the electronic submission of tenders are available.
1) Companies must check the tender documents immediately for completeness of the documents and for any ambiguity. If, in the opinion of the company, the tender documents contain ambiguity, they must inform the latter without delay and before submitting an offer.
Company-are invited to submit their questions early and in advance in the interests of a quick resolution of ambiguities. Companies have infringements of public procurement rules.
The provisions of Section 160 (3) GWB apply. In so far as the ruege is not remedied, the rioting company is in particular obliged, within 15 calendar days of receipt of this noticesubmit a request for verification to the relevant procurement board. Otherwise, the application is inadmissible pursuant to - 160 (3) GWB.
Since the tender documents are available to the candidate group without registration, they are themselves responsible for obtaining any postponements and notifications; Such information can only be obtained from registered or legitimate applicantsAll non-registered candidates must regularly check the tender documents, including questionnaire and bidder information, which can be viewed on the tendering platform for any changes (see VK Suedbayern, order of 17.10.2016 Z3-3-3194-1-36- 09/16); 2) The tender documents may only be used to make an offer. In case of resignationAll tender documents must be destroyed upon submission of the tender;
3) Expenses of the tenderer in the context of the tendering procedure, in particular for the preparation of the tender, are not refunded. By submitting an offer, the tenderer agrees to this rule;
4) Questions on the tender documents or information on this award procedure in general can be submitted by 25.1.201910.00 o'clock by E-Mail (
[email protected]) or preferably over the Bieterkommunikation of the on-line platform to be made.
In-depth questions are generally not taken into account. The risk of complete and readable transmission of the request for information is borne by the requesting company;
5) The offer is to be published at the latest under no. IV.2.2)-electronic form. An offer to tender in paper form, fax or e-mail is not permitted;
6) Side offers are not permitted;
7) The awarding authority shall refuse to inspect the documents, insofar as this is for important reasons, in particular the protection of the security or for the preservation of operations - or business secrets is required (- 165 Abs. 2 GWB).
Each participant has atSubmit a bid to the secret protection and make this clear in the offer. If there is no identification, the awarding authority may assume that consent has been granted (- 165 (3) GWB)
Internet address (URL): http://www.geb-goettingen.de