Object of the contractCoated materials
Description: Contract notice: Coated materials
Authority Type: Regional or local authority
Contact Nature: Supplies
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: Lowest price
CPV code: 44113300, 44113300, 44113700, 44113300, 44113700
CPV Description: Coated materials.
Road-repair materials.
Urban area Muenchen, Staedtische Asphaltverlegung; Asphalt mix and acceptance of reclaimed asphalt; Order number: T50a367018
Asphalt mix and acceptance of reclaimed asphalt
Main Site: Stadtgebiet Muenchen
Asphalt mix and acceptance of dismantling asphalt
Pickup and delivery by Staedt. Asphalt laying
Lot 1:
Asphalt mixed:
- 100 t Asphalttrabinder 50/70, AC 16 TN,
- 500 t asphalt base binder 50/70, AC 22 TN,
- 2, 000 t asphalt base binder 30/45, AC 32 TN,
- 2, 000 t asphalt base binder 50/70, AC 32 TN,
- 3 000 t asphalt base layer binder 30/45, AC 32 TS,
- 1 000 t asphalt base layer binder 50/70, AC 16 TD,
- 200 t asphalt binder (leveling) binder B 50/70, AC 16 BN,
- 1 000 t asphalt binder binder 25 / 55-55 (PmB 45), AC 16 BS,
- 2, 000 t asphalt binder binder 25 / 55-55 (PmB 45), AC 22 BS,
- 500 t asphalt concrete binder 50/70, AC 5 DL,
- 1 500 t asphalt concrete binder 50/70, AC 8 DN,
- 500 t asphalt concrete binder 25 / 55-55, AC 8 DS,
- 500 t asphalt concrete binder 50/70, AC 8 DS,
- 1 000 t asphaltic concrete binder 50/70, AC 11 DN,
- 500 t asphaltic concrete Bcompound 25 / 55-55, AC 11 DS,
- 500 t asphalt concrete binder 50/70, AC 11 DS,
- 500 t stone mastic asphalt binder 25 / 55-55 (PmB 45), PSV = 52, SMA 8 S,
- 500 t split mastic asphalt binder 25 / 55-55 (PmB 45), PSV = 52, SMA 11 S,
- 15 t of chippings, 1/3 granite.
Removal asphalt:
- 500 t Asphalt breakup (floes = 80 x 80 x 20 cm),
- 2 000 t Asphaltfraesgut A (Milled material from cover and binder5, 000 t Asphaltfraesgut B (mixed milled from all asphalt layers / layers).
Other services:
- 3 pc Tarpaulins for hot asphalt, size 2.80 x 5.50 m,
- 25 pcs large (10 l).
Self-explanations:
- Information on entry in the professional register,
- Indication that no serious misconduct has been proven to prove the reliability of the applicant in Question
The comments to be made are summarized in the form "Self-assessments on suitability / delivery performance EU" which accompanies the tender documents.
Alternatively, a single European Self-Statement (EEE) can be submitted.
Self-explanations:
- turnover for the last 3 financial years,
- Number of years completed in the past 3 yearsEmployees who have been employed in the employment service, - information indicating that the obligation to pay taxes and contributions and contributions to the statutory social security scheme have been duly fulfilled in so far as they are subject to the obligation to pay the contribution, - indication of whether insolvency proceedings or similar proceedings have been opened or the opening has been requested orthe application was rejected for lack of assets or a bankruptcy plan was confirmed in full force,
indication of whether the company is in liquidation,
indication that the company has registered with the professional association. The statements to be made are to be made in the form "Self - explanatory notes to the Suitability / delivery EU ", which was enclosed with the tender documentst.
Alternatively, the submission of a Single European Self-Statement (EEE) is possible.
Important notes:
1) Questions and comments on the tender documents
Questions and comments on the tender documents are available via e-mail to announcements.vz2.bau@muenchen. until 10 working days before the expiry of the offer period. Binding statements shall be considered as statements, conctizations or changes to the procurement documents at the Internet address www.muenchen.de/rathaus/Stadtverwaltung/baureferat/ausschreibungen/eu-verfahren.html published up to 6 calendar days before expiry of the offer period.
2) Information obligation of the tenderer
The bidders are obliged to up to 6 calendar days before expiry of the offer period on the above-mentioned website, -whether there have been any explanations, concretizations or changes in the tender documents. It is expressly stated that there may be a need to postpone the offer period within these 6 calendar days. In such a case, you will also be informed immediately on the above-mentioned website.
All published informationIn the opinion of the client, if the published statements, concretions or changes are relevant to the calculation, the following applies: If the offer has already been sent, the customer must e-mail it by the end of the offer period to announce at
[email protected], sofern
The old offer is declared invalid and no new offer is made,
The old offer is declared invalid and a new offer is made. In this case, the new offer must be available to the client before the end of the offer period,
The old offer - in addition to the specification or amendment letter - should be maintained. On the possibility, this, of the eggIn case of a case-dependent variation, it is explicitly pointed out in the corresponding concretization or amendment letter. In this case, the undersigned must have the signed concretization or amendment letter before the end of the offer period,
The old offer should be maintained unchanged. In this case it is noted that an eventualitys already submitted offer, if necessary, must be adapted to specifications or changes. A not suitably adapted offer is regularly excluded from the evaluation.
Unless a separate notification is received, it is assumed that the old offer should be maintained unchanged.
3) Submission of offers
Offers are exclusively in Schriftform in a closed envelope at the state capital Muenchen, Baureferat, Submissionsbuero, Zi. No .: 0.243, Friedenstrasse 40, 81671 Muenchen submit.
Please use this for (even with personal delivery) the provided stickers.
Internet address (URL): www.muenchen.de