Summary: Consulting Firm for the Study, Monitoring and Control of the Works of the Extension and Rehabilitation Program of the Sanitation Network
Deadline: 28 Dec 2017
Posting Date: 13 Dec 2017
Other Information
Notice Type: Tender
TOT Ref.No.: 18794011
Document Ref. No.: AMI/ PERRAD/Nov17
Competition: ICB
Financier: Agence Francaise De Development (AFD)
Purchaser Ownership: -
Tender Value: Refer Document
CPV Classification
71800000 - Consulting services for water-supply and waste consultancy
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Expression of Interest are invited for Consulting Firm for the Study, Monitoring and Control of the Works of the Extension and Rehabilitation Program of the Sanitation Network of Djibouti (PERRAD).
The PERRAD program consists of carrying out extension and rehabilitation works on the Djibouti sanitation network. It includes:
- the extension of about 25km of gravity collection and discharge network with a diameter of between 160 and 300mm (secondary networks in HDPE or GRP),
- the rehabilitation and possibly the installation of water pumping stations. waste of capacity between 68 and 400 m3 / h,
- the realization of boxes with sanitation connections.
The works will be allotted in a single lot and their duration of realization will be 12 months. Works contracts will be awarded through open tendering.
The allotment and description above are therefore indicative. In addition, the work can be adjusted according to the available envelope.
The project management services to be carried out concern:
a) The completion of simplified pre-project studies (APS), detailed preliminary design (ODA) and environmental and social impact studies (ESIA) relating to works ;
b) the drafting of bidding documents for this work and support to ONEAD for the procurement and analysis of bids;
c) The approval of the studies and implementation plans carried out by the contractors, as well as the validation and the follow-up of the schedules of execution of the works;
d) Monitoring and control of all civil works, supply and installation of new hydromechanical and electrical equipment to replace old non-functional equipment and pipelines:
• coordination of works;
• the establishment of work attachments, site meeting minutes and site visits;
• compliance of works and equipment;
• assistance to the Owner for the acceptance of works and commissioning of the facilities.
e) Monitoring of the Environmental and Social Management Plan on the different perimeters;
f) the social support that will follow the installation of the tertiary wastewater network: conducting surveys, assisting with the constitution of subsidy files and awareness campaigns on hygiene and sanitation.
[Disclaimer: The above text is machine translated. For accurate information kindly refer the original document.]
Documents
Tender Notice