Expired Tender Somalia ICB TOT Ref. 43078759

Consultancy Services of Preparation of Feasibility Tender - 43078759

Tender notice from Somalia, published on 01 Jun 2020.

Executive Summary

The GAROWE MUNICIPALITY has issued a Tender notice for the procurement of a Consultancy Services of Preparation of Feasibility Studies, Detailed Engineering Designs And Bidding Documents for Storm-Water Drainage in Garowe in the Somalia. This Tender notice was published on 01 Jun 2020 and is scheduled to close on 15 Jun 2020, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 43078759, while the tender notice number is SO-GM-173306-CS-CQS and Register on the platform.

Key facts

Summary
Consultancy Services of Preparation of Feasibility Studies, Detailed Engineering Designs And Bidding Documents for Storm-Water Drainage in Garowe
TOT Ref. No.
43078759
Document Ref. No.
SO-GM-173306-CS-CQS
Country
Somalia
Notice type
Tender
Competition
ICB
Publication date
01 Jun 2020
Bid deadline
15 Jun 2020
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Other Funding Agencies

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Tenders are invited for Consultancy Services of Preparation of Feasibility Studies, Detailed Engineering Designs And Bidding Documents for Stormwater Drainage in Garowe.
Somalia Urban Resilience Project II (P170922)
Project Implementation Unit
Garowe Municipality
Puntland State of Somalia
SOMALIA URBAN RESILIENCE PROJECT PHASE II
Terms of Reference for Consultancy Services of Preparartion of Feasibilty Studies, Detailed Engineering Designs And Bidding Documents for Stormwater Drainage in Garowe
1 Background
Somalia Urban Resilience Project II (SURP II) is a municipal governance and infrastructure development project financed by the World Bank and its partners, aimed at improving access to urban infrastructure and strengthening municipal governance in Somalia. The Project also aims to strengthen intergovernmental relationships between the federal, state, region and municipal levels. It is intended that the SURP II will also strengthen the state-citizen relationship and the government-s legitimacy in the eyes of its people by providing visible and tangible benefits. The Project is thus as much about urban resilience as it is about peace building and institution building. SURP II builds on the preparation work carried out under World Bank funded Somalia Urban Investment Planning Project (SUIPP). With the SUIPP funding, the United Nations Office for Project Services (UNOPS) was contracted and prepared the feasibility studies, preliminary design, and detailed engineering designs for roads in Mogadishu, Kismayo, Garowe and Baidoa. While designs and bidding documents for roads in Kismayo and Baidoa are ready, Mogadishu and Garowe have engaged Consultants to review and update previous road designs.
The Bank also supported all four municipalities set up and operationalize Project Implementation Units (PIUs), and build fiduciary, safeguards, project management, and monitoring and evaluation capacity of the PIU staff. The Federal Government of Somalia will soon set up a Project Steering Committee to oversee implementation of SURP II and a Project Coordination Unit to provide technical support and guidance to the municipalities as needed.
Garowe city has been experiencing rapid urban growth since the collapse of the central government in 1991, taking advantage also of its status as a political and administrative capital. The population influx in the early 1990-s and the return of IDPs returnees who fled conflict have led to continuous population growth in the district. The city is known for its good hierarchy of roads and is characterized by a compact form, with an average density of roughly 80-100 people/ha.
Given the mostly unpaved roads and being the urban area mostly composed of large plots only partially build, Garowe has very limited impervious surfaces. However, urban development is reducing ground permeability and results in increased storm water runoff volume and peak discharge, which is evidenced by chronic flooding and degraded water quality.
As the runoff flows over the land or impervious surfaces (paved streets and building rooftops), it accumulates on the roads causing flooding, interruption of traffic movement, and damage to roads and other pavements. Flooding of stormwater also results in ponding after the rainfall even and some of the ponds take a long time before all the water evaporates. Such ponds become good breeding areas for mosquitos and other parasites.
There is no proper drainage network plan other than the natural streams which conflict with the road infrastructure at some points. This results in directly flood related problems at multiple locations. Garowe urban area is developed without planned drainage. Developed plans for the city, does not considered the impact of urbanization on drainage flow. City public works and municipality commonly do not have the hydrologic support to cope with this problem and engineering works, where built-up areas leave no space into which flow could be diverted during flood events, as a means of decreasing peak flows. Besides the failure to plan drainage networks adequately, municipality encounters many difficulties in enforcing legislation. These difficulties are due to the following:
 Low investments in urban drainage facilities;
 Increase in peak and flood frequency due to inadequate drainage management and design; and due to basin urbanization.
 Lack of drainage and other sanitary facilities for poor population.
 Population settlements on river flood plains, with increased flood damage;
 Degradation of urban areas due to erosion and sedimentation;
 Water quality impact from wash-load of urban surface and solid waste.
 large increase in urbanization: most new developments within in the city boundaries do not have the required stormwater and sewer networks. This arises from lack of control and law enforcement;
 Invasion of public areas: public areas, such as water streams, become occupied by poor and homeless people who settle there;
 Occupation of flow conveyance areas: during periods when no floods occur, low-lying and other areas that might be reserved for flood-water dispersal are taken for poor-quality dwellings. These areas have high potential risk for damage and loss of life.
 One of the main causes of flooding in urban drainage in Garowe are the decreased hydraulic capacity of the stormwater drainage due to sand blockages, conduits and trash filling the channels and waterways during floods
 lack of a reliable garbage collection and disposal. Part of the population in poor neighborhood dumps the trash on streets and in the drainage system;
 lack of control in construction sites.
 Problems caused by poor drainage. Removing stormwater and household wastewater (sometimes called “sullage”) is an important environmental health intervention for reducing disease. Poorly drained stormwater forms stagnant pools that provide breeding sites for disease vectors. Because of this, some diseases are more common in the wet season than the dry season. Household wastewater may also contain pathogens that can pollute groundwater sources, increasing the risk of diseases such as lymphatic filariasis. Poor drainage can lead to flooding, resulting in property loss, and people may even be forced to move to escape floodwaters. Flooding may also damage water supply

infrastructure and contaminate domestic water sources.

Drainage and public health in areas where drainage and sanitation are poor, water runs over the ground

during rainstorms, picks up faeces and contaminates water sources. This contributes significantly to the

spread of diseases such as typhoid and cholera, and may increase the likelihood of contracting worm

infections from soil contaminated by faeces. Flooding itself may displace populations and lead to further

health problems

The proposed drainage study and future construction of drainage system in Garowe therefore addresses

some of the above challenges and proposes operation and maintenance plans for sustainability of the

infrastructure. It also ties into the ongoing Somali Urban Resilience Project (SURP) and planned SURPII,

that became effectiveinFebruary2020, and will finance urban roads and associated drainage network in

Garowe that were prioritized under SUIPP. The comprehensive drainage network will also help ensure

that roads constructed under SURP and existing urban roads financed under JPLG and USAID are well

maintained, Moreover, the drainage assessment and feasibility studies will map out existing road

drainage constructed under SURP and identify gaps in their connectivity and develop topography specific

designs. The study will be a roadmap to mitigate unplanned expansion of the drainage system, frequent

localized flooding, road shoulder erosion among others. The proposed activities, together with SURP and

SURPII, will help strengthen government effectiveness in providing municipal governance and urban

resilience through better planning and (re)construction of critical urban roads and drainage systems in

Garowe. Modalities of public-private partnership and community participation in construction and

operation and maintenance (O&M) will be considered.

2 Study Objective

The objective of the consulting services is to conduct a feasibility study and detailed

engineering designs of the proposed Garowe drainage system and prepares bidding documents

for appropriate contract packaging.

3 Scope of Work

This study will build on previous work under SUIPP where feasibility studies of 19Km (from a list of

27km) of urban roads and 2 bridges were undertaken in 2016 in Garowe. With investments drawn from

this study, the Municipality has already constructed 4.9Km under SURP and is implementing SURP II

where detailed designs are ongoing for another 9Km of urban roads with roadside drains and the Hospital

bridge.Between2010-2013 a number of roads have been engineered to earth and gravel surfaces. The

2016 study also established that through UN-Habitat, a survey of roads conditions has been conducted

and the results have been documented and recorded on a GIS platform. And, with JPLG assistance, 7.6

5

Km of roads were in the process of being upgraded to bitumen surface standards in 2016 (not part of the

study). Garowe is a fast-growing city and even though the current Garowe city population is estimated at

82, 000, this is rapidly increasing resulting in more urbanization and demand for better infrastructure and

services. Construction of modern commercial building is starting to be witnessed following the current

effort by government to improve road infrastructure. A solution to the earlier highlighted drainage

challenges in the city requires an investment plan for drainage that is based on a detailed feasibility study

of existing and new drainage network for Garowecity.It is estimated that about 60Km of a combination of

trunk and seconda

Documents

Tender Notice
Login to view

Similar tenders

Somalia Public Procurement Intelligence

Frequently asked questions

The bid deadline for Consultancy Services of Preparation of Feasibility Studies, Detailed Engineering Designs And Bidding Documents for Storm-Water Drainage in Garowe was 15 Jun 2020. Bidding is closed.

This tender has been issued by GAROWE MUNICIPALITY in Somalia.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is financed by Other Funding Agencies.

The tender is classified under the following CPV code(s): 71241000 - Feasibility study, advisory service, analysis.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 43078759. The purchaser document reference is SO-GM-173306-CS-CQS.

See the Similar Tenders section on this page or browse other tenders from Somalia.

This tender falls under Construction and Real Estate in Somalia. Suppliers in these sectors can track similar Somalia tenders using CPV-based alerts.