Consultancy Services for the Engineering Design Tender - 95492987

The THE MINISTRY OF SANITATION AND WATER RESOURCES has issued a Tender notice for the procurement of a Consultancy Services for the Engineering Design and Construction Supervision of Engineered Landfill for Greater Accra Metropolitan and Material Recovery Facility in the Ghana. This Tender notice was published on 20 Jan 2024 and is scheduled to close on 29 Feb 2024, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 95492987, while the tender notice number is GASSLIP/S/013/2021 and Registering on the platform.

Expired Tender

Procurement Summary

Country: Ghana

Summary: Consultancy Services for the Engineering Design and Construction Supervision of Engineered Landfill for Greater Accra Metropolitan and Material Recovery Facility

Deadline: 29 Feb 2024

Posting Date: 20 Jan 2024

Other Information

Notice Type: Tender

TOT Ref.No.: 95492987

Document Ref. No.: GASSLIP/S/013/2021

Competition: ICB

Financier: African Development Bank (AfDB)

Purchaser Ownership: Public

Tender Value: Refer Document

Purchaser's Detail

Name: Login to see tender_details

Address: Login to see tender_details

Email: Login to see tender_details

Login to see details

Tender Details

Tenders are invited for Consultancy Services for the Engineering Design and Construction Supervision of Engineered Landfill for Greater Accra Metropolitan and Material Recovery Facility
Specific objectives (Design Phase):

i. To review current literature (sample design, design guidelines, procedures, reports,

etc.) and legal framework, reforms and policy requirements related to waste

processing center and Engineered Landfill designs.

ii. To conduct all required surveys and investigations including, but not limited to,

topographical survey, geo-technical investigation, soil investigation, hydrogeological investigation, meteorological investigation, identification of underground

utilities etc.

iii. To conduct detailed Engineering Surveys and Designs of various processing facilities

like Composting unit with leachate collection system, enclosed inorganic waste

recovery center (with autonomous facilities of feeding conveyor, sorting platform,

sorting conveyor, reversible belt conveyor, automatic press for

compaction/packaging), residue management facilities, access road, internal service

road, storm water diversion drainage and other required infrastructures etc.) Including

civil, mechanical and electrical components of waste processing based on best

international/national practices in identified places within the various spots.

iv. To conduct detailed Engineering Surveys and Designs of leachate treatment plant

facilities for Engineered Landfill for all types of waste for safe disposal.

v. To conduct environmental samplings and studies relevant to the waste management

facilities and designs.

vi. To conduct socio-economic survey relevant to the waste management facilities and

designs.

vii. To develop the most cost-effective design concept to address environmental and

social impact mitigation requirements,

viii. To prepare engineering drawings and cost estimation for Material Recovery Facility

Center and Sanitary/Engineered Landfill.

ix. To prepare technical specifications, operating manuals, health and safety plans.

x. To prepare Environmental and Social Management Plan

2.2. Specific Objectives (Construction Phase)

i. To ensure all construction activities/tasks are carried out timely by all contractors as

stated in their contracts.

ii. To supervise and ensure quality of work, standards and specifications as well as

installation of equipment and supply of materials.

iii. To monitor site layout plan and provide progress report (photos, data, videos, maps,

drawings, etc) on field works and construction activities on sites.

iv. To review the performance of the contractors and make recommendations to the

Client for consideration.

v. To provide prompt solutions to address field/sites challenges/issues and address

related performance of the Contractors, MMDAs, Communities, Concern Groups,

other interested Parties/Stakeholders.

vi. To make a presentation on monthly or quarterly progress of work on construction

activities of the assignment.

2.3. Specific Objectives (Post Construction Phase)

i. To monitor, evaluate and submit full report capturing all post construction phase

activities of the project including resolutions to complains and lessons learnt.

ii. To prompt and ensure that all contractors have completed various tasks/corrections

during the defect liability period including submission of final report (end of project

report) to GASSLIP/MSWR/AfDB for approval.

iii. To prepare Monitoring Plan with Institutional Model for Operation, Maintenance

and Monitoring.

Documents

 Tender Notice


Request Demo
GiZ Tenders India

Procurement Documents for Ghana

Access a comprehensive library of standard procurement documents specific to Ghana. Here, you'll find all the essential forms, guidelines, and templates required for tender applications and submissions in Ghana

Explore Procurement Documents for Ghana


Want To Bid in This Tender?

Get Local Agent Support in Ghana and 60 More Countries.

View All The Services


View Tenders By


Publish Tenders


Have Any Dispute With The Purchaser?